What's changing near GU11 3RE
Within 2 km, around Aldershot Park in Rushmoor. Building, planning, schools, transport, prices and crime.
161new homes completed within 2 km, last 2 years
47homes given permission on brownfield sites since 2021
+4.9%like-for-like prices in Aldershot Park, 2024 → 2025 (council +2.8%)
+13%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
28 new homes completedflats · Jul 2026
Jul 2026
1.5 km away - New homes
28 new homes completedflats · Jul 2026
Jul 2026
1.5 km away - New homes
9 new homes completedhouses · Jan 2026 – Jul 2026
Jul 2026
1.5 km away - New schoolFeb 2026
1.7 km away - Planning permissionDec 2025
1.7 km away - New homes
6 new homes completedhouses · Nov 2025
Nov 2025
2.0 km away - New homes
15 new homes completedflats · Oct 2025
Oct 2025
1.5 km away - New homes
9 new homes completedhouses · Jul 2025 – Sep 2025
Sept 2025
1.4 km away - New homes
8 new homes completedflats · Sep 2025
Sept 2025
1.7 km away - New homes
5 new homes completedhouses · Jul 2025
Jul 2025
2.0 km away - New homes
11 new homes completed
13homes extended 2021–2025, typically adding 32 m²
25since energy certificates began (2008)
0in GU11 3RE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
16 planned, approved or being built and 5 running (16 MW between them). Those within 5 km are on the map above.
- Rooftop solar
David Lloyd Leisure Club, Wilkinson Way - Solar PV PanelsApproved, not yet built · 330 kW
Sept 2023
1.6 km away - Rooftop solar
Kinetrol Manufacturing,Farnham Trading Estate - Solar PanelsPlanning application in · 240 kW
Oct 2022
2.0 km away - Rooftop solar
Brightwells Road - Solar PanelsApproved, not yet built · 330 kW
Nov 2022
3.5 km away - Battery storage
University For The Creative Arts, Falkner Road - ASHP & Battery StorageApproved, not yet built
Mar 2024
4.0 km away - Rooftop solar
University For The Creative Arts, Falkner Road - Solar PV PanelsApproved, not yet built · 570 kW
Sept 2023
4.0 km away - Rooftop solar
Farnborough International Exhibition Centre, Etps Road - Solar PanelsBeing built · 1 MW
Feb 2024
4.8 km away - Solar farm
Templer Avenue - Solar Photovoltaic PanelApproved, not yet built · 230 kW
Dec 2022
5.5 km away - Rooftop solar
Invincible Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2023
5.9 km away - Solar farm
St Michaels Abbey, Farnborough Road - Solar PanelsApproved, not yet built · 210 kW
Apr 2026
6.9 km away - Battery storage
Crondall Road, Crondall - Fleet Bramley Battery Energy StorageApproved, not yet built · 100 MW
Aug 20257.5 km away
Road and street works within 1 km
5 permitted works running now or planned, 2 of them major.
- Major
Boxalls Lane, AldershotHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
400 m away - Major
Tices Meadow Footpath, AldershotUtility asset works · BT · No carriageway incursion
Dec 2026 to Dec 2026
700 m away - Standard
Gloucester Road, AldershotWorks for road purposes · HAMPSHIRE COUNTY COUNCIL · Stop/go boards
Oct 2026 to Oct 2026
550 m away - Standard
Lower Weybourne Lane, FarnhamUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Multi-way signals
Aug 2027 to Aug 2027
600 m away - Standard
Badshot Lea Road, FarnhamNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Multi-way signals
Aug 2027 to Aug 2027
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
14.3 km away - Decideddecided May 2022
23.4 km away - Decideddecided Sept 2016
28.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Runfold Landfill (landfill gas, 1.9 km); Farnborough Airport - Solar Panels (rooftop solar, 5.5 km); Farnham Landfill (landfill gas, 6.6 km); Marsh House Solar Park (solar farm, 7.2 km); Hungerford Farm (solar farm, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.