What's changing near GU10 4TU
Within 2 km, around Farnham Wrecclesham in Waverley. Building, planning, schools, transport, prices and crime.
13new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.1%like-for-like prices in Farnham Wrecclesham, 2024 → 2025 (council +2.3%)
+26%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
20homes extended 2021–2025, typically adding 55 m²
37since energy certificates began (2008)
5in GU10 4TU itself
- Extendedcertificate 2024
- Extendedcertificate 2023
- Extendedcertificate 2023
- Extendedcertificate 2021
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 3 running (9 MW between them). Those within 5 km are on the map above.
- Rooftop solar
University For The Creative Arts, Falkner Road - Solar PV PanelsApproved, not yet built · 570 kW
Sept 2023
3.0 km away - Battery storage
University For The Creative Arts, Falkner Road - ASHP & Battery StorageApproved, not yet built
Mar 2024
3.0 km away - Rooftop solar
Brightwells Road - Solar PanelsApproved, not yet built · 330 kW
Nov 2022
3.2 km away - Rooftop solar
Kinetrol Manufacturing,Farnham Trading Estate - Solar PanelsPlanning application in · 240 kW
Oct 2022
4.5 km away - Rooftop solar
David Lloyd Leisure Club, Wilkinson Way - Solar PV PanelsApproved, not yet built · 330 kW
Sept 2023
4.9 km away - Rooftop solar
Sandhill Farm, Picketts Hill - Solar panelsApproved, not yet built · 440 kW
Oct 2024
6.0 km away - Battery storage
Crondall Road, Crondall - Fleet Bramley Battery Energy StorageApproved, not yet built · 100 MW
Aug 2025
7.4 km away - Battery storage
Penn Croft Farm, Crondall - Battery Energy Storage FacilityApproved, not yet built · 100 MW
Jan 2023
7.6 km away - Solar farm
Steyne Farm - Solar PanelsPlanning application in
Jan 2021
7.7 km away - Battery storage
Rye CommonApproved, not yet built · 50 MW
Sept 2021
7.9 km away
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
- Major
Echo Barn Lane, FarnhamHighway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
550 m away - Major
Shortheath Road, FarnhamHighway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
600 m away - Major
Burnt Hill Road, FarnhamUtility repair and maintenance works · THAMES WATER · Road closure
Feb 2027 to Feb 2027
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
8.7 km away - Decideddecided May 2022
29.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Farnham Landfill (landfill gas, 1.2 km); Marsh House Solar Park (solar farm, 3.1 km); Runfold Landfill (landfill gas, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.