What's changing near GU10 3QW
Within 2 km, around Farnham Moor Park & Bourne in Waverley. Building, planning, schools, transport, prices and crime.
19new homes completed within 2 km, last 2 years
34homes given permission on brownfield sites since 2021
+8.6%like-for-like prices in Farnham Moor Park & Bourne, 2024 → 2025 (council +2.3%)
-12%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permissionJun 2023
1.3 km away - Planning permissionJan 2023
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 16 postcodes nearby had new homes completed in the last two years.
14homes extended 2021–2025, typically adding 74 m²
29since energy certificates began (2008)
3in GU10 3QW itself
- Extendedcertificate 2019
- Extendedcertificate 2014
- Extendedcertificate 2013
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
33hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 4 running (11 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Brightwells Road - Solar PanelsApproved, not yet built · 330 kW
Nov 2022
2.1 km away - Battery storage
University For The Creative Arts, Falkner Road - ASHP & Battery StorageApproved, not yet built
Mar 2024
2.4 km away - Rooftop solar
University For The Creative Arts, Falkner Road - Solar PV PanelsApproved, not yet built · 570 kW
Sept 2023
2.4 km away - Rooftop solar
Kinetrol Manufacturing,Farnham Trading Estate - Solar PanelsPlanning application in · 240 kW
Oct 2022
2.7 km away - Rooftop solar
David Lloyd Leisure Club, Wilkinson Way - Solar PV PanelsApproved, not yet built · 330 kW
Sept 2023
3.2 km away - Battery storage
Crondall Road, Crondall - Fleet Bramley Battery Energy StorageApproved, not yet built · 100 MW
Aug 2025
7.7 km away - Rooftop solar
Sandhill Farm, Picketts Hill - Solar panelsApproved, not yet built · 440 kW
Oct 2024
7.8 km away - Battery storage
Tilford Road, Nr Tower Road - Micro Energy Storage FacilityPlanning application in · 200 kW
Aug 2024
8.4 km away - Battery storage
Rye CommonApproved, not yet built · 50 MW
Sept 2021
8.4 km away - Battery storage
Blue Bell Lodge, Rye Common Lane - Battery StorageApproved, not yet built · 50 MW
May 20238.5 km away
Road and street works within 1 km
4 permitted works running now or planned, 4 of them major.
- Major
Old Frensham Road, FarnhamNew service connection · SOUTH EAST WATER · Road closure
Nov 2026 to Nov 2026
600 m away - Major
Aveley Lane, FarnhamUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Nov 2026
850 m away - Major, planned
Ridgway Road, FarnhamUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Nov 2026
900 m away - Major, planned
Lancaster Avenue, FarnhamUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Nov 2026 to Jan 2027
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
10.8 km away - Decideddecided May 2022
27.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Runfold Landfill (landfill gas, 2.8 km); Farnham Landfill (landfill gas, 2.9 km); Marsh House Solar Park (solar farm, 4.4 km); Farnborough Airport - Solar Panels (rooftop solar, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.