What's changing near GL8 8JE
Within 2 km, around Tetbury in Cotswold. Building, planning, schools, transport, prices and crime.
48new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-1.6%like-for-like prices in Tetbury, 2024 → 2025 (council +1.6%)
-59%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
7 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
1.3 km away - New homes
33 new homes completed7 flats, 26 houses · Aug 2025 – Aug 2026
Aug 2026
600 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
20homes extended 2021–2025, typically adding 25 m²
37since energy certificates began (2008)
0in GL8 8JE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
1,648hours of spills in 2025 between them (typical neighbourhood: about 36)
127spill events counted
- Wessex Water
Tetbury Waste Water Treatment Worksinto River Avon78 spills, 1,495 hours in 2025
1.1 km away - Wessex Water
Tetbury Waste Water Treatment Worksinto River Avon49 spills, 153 hours in 2025
700 m away - Wessex Water
Springfields Pumping Stationinto The River Avon(Tetbury Branch)0 spills, 0 hours in 2025
700 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
7 planned, approved or being built and 6 running (98 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Tetbury Audi, Quercus Road - Solar ArrayApproved, not yet built · 200 kW
Nov 2022
1.1 km away - Solar farm
Crudwell Road Solar Farm & Battery StorageApproved, not yet built · 50 MW
Aug 2023
5.5 km away - Battery storage
Crudwell Road Solar Farm & Battery StorageApproved, not yet built
Aug 2023
5.5 km away - Rooftop solar
Whitewalls, Easton Grey - Solar PV PanelsPlanning application in · 220 kW
Jun 2026
5.8 km away - Rooftop solar
Wellington House, Bath Road - Solar PanelsApproved, not yet built · 240 kW
Jan 2022
8.8 km away - Solar farm
Lime Down - Solar ProjectPlanning application in · 500 MW
Oct 2025
9.0 km away - Battery storage
Lime Down - Battery StoragePlanning application in · 500 MW
Oct 2025
9.0 km away
Running nearest: NEWNTON DAIRY FARM (solar farm, 3.6 km); Marsh Farm (solar farm, 3.7 km); Malmesbury Solar (solar farm, 3.9 km); Lodge Farm (Poulshot) (solar farm, 7.8 km); Kemble Wick (solar farm, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major
Silver Street, TetburyWorks for road purposes · GLOUCESTERSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026
300 m away - Immediate - urgent
West Street, TetburyHighway repair and maintenance works · GLOUCESTERSHIRE COUNTY COUNCIL · Some carriageway incursion
Feb 2025 to Dec 2026
350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Examinationapplication due September 2025
9.7 km away - Decided
A417 Missing Link Highways · Located between the Brockworth bypass and Cowley roundabout in Gloucestershire decided Nov 2022
22.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.