Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
12 planned, approved or being built and 5 running (43 MW between them). Those within 5 km are on the map above.
Rooftop solar
St Pauls Medical Centre, Swindon Road - Solar PanelsApproved, not yet built · 160 kW
Feb 2024 4.9 km away
Rooftop solar
Big Yellow Self Storage, Princess Elizabeth Way - Solar PanelsApproved, not yet built · 180 kW
Aug 2024 5.5 km away
Rooftop solar
All Saints Academy, Blaisdon Way - Solar PanelApproved, not yet built · 180 kW
Nov 2025 5.8 km away
Rooftop solar
Sandfields Care Home, St Georges Road - Solar PV PanelsApproved, not yet built · 150 kW
Oct 2023 5.8 km away
Solar farm
Claydon Farm - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Dec 2021 5.8 km away
Battery storage
Claydon Farm - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Dec 2021 5.8 km away
Rooftop solar
Ladies College Swimming Pool, Malvern Road - Solar PanelsApproved, not yet built · 160 kW
Jun 2024 6.0 km away
Battery storage
Cheltenham General Hospital - Battery Energy Storage SystemApproved, not yet built · 2 MW
Sept 2021 6.1 km away
Battery storage
Tredington House Farm, Tredington - Battery Energy Storage FacilityApproved, not yet built · 40 MW
Dec 2024 6.8 km away
Rooftop solar
Dairy Way, Northway Lane, Unit 22 - Solar PanelsApproved, not yet built · 590 kW
Road and street works within 1 km
1 permitted works running now or planned.
Minor
Two Hedges Road, CheltenhamUtility repair and maintenance works · SEVERN TRENT WATER · Multi-way signals
Oct 2026 to Oct 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
M5 Junction 10 Improvements SchemeHighways · In Gloucestershire, 5 miles to the south of Tewkesbury and 4 miles to the north-west of Cheltenham.
decided Jun 2025 6.6 km away
Decided
A417 Missing Link Highways · Located between the Brockworth bypass and Cowley roundabout in Gloucestershire
decided Nov 2022 12.1 km away
Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
application due April 2027 27.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Cleeve Hill, Gotherington & Apperley: +18% over five years (2020 → 2025).
Council tax list: 70 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.6% in two years.