What's changing near GL51 9SW
Within 2 km, around Cleeve Hill, Gotherington & Apperley in Tewkesbury. Building, planning, schools, transport, prices and crime.
246new homes completed within 2 km, last 2 years
71homes given permission on brownfield sites since 2021
-3.2%like-for-like prices in Cleeve Hill, Gotherington & Apperley, 2024 → 2025 (council +1.9%)
-60%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
27 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
1.3 km away - New homes
64 new homes completed15 flats, 49 houses · Jun 2025 – Oct 2026
Oct 2026
1.3 km away - New homes
19 new homes completedhouses · Nov 2025 – Sep 2026
Sept 2026
1.3 km away - New homes
19 new homes completed9 flats, 10 houses · Mar 2025 – May 2026
May 2026
1.3 km away - New homes
26 new homes completed13 flats, 13 houses · May 2025 – Apr 2026
Apr 2026
1.2 km away - New homes
32 new homes completed4 flats, 28 houses · Dec 2024 – Jun 2025
Jun 2025
1.3 km away - New homes
53 new homes completed8 flats, 45 houses · Oct 2024 – Mar 2025
Mar 2025
1.3 km away - Planning permissionSept 2022
1.4 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
1homes extended 2021–2025, typically adding 81 m²
1since energy certificates began (2008)
0in GL51 9SW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
438hours of spills in 2025 between them (typical neighbourhood: about 36)
37spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
31 planned, approved or being built and 6 running (44 MW between them). Those within 5 km are on the map above.
- Rooftop solar
All Saints Academy, Blaisdon Way - Solar PanelApproved, not yet built · 180 kW
Nov 2025
1.1 km away - Rooftop solar
Big Yellow Self Storage, Princess Elizabeth Way - Solar PanelsApproved, not yet built · 180 kW
Aug 2024
1.7 km away - Rooftop solar
Sandfields Care Home, St Georges Road - Solar PV PanelsApproved, not yet built · 150 kW
Oct 2023
3.1 km away - Rooftop solar
St Pauls Medical Centre, Swindon Road - Solar PanelsApproved, not yet built · 160 kW
Feb 2024
3.2 km away - Rooftop solar
Ladies College Swimming Pool, Malvern Road - Solar PanelsApproved, not yet built · 160 kW
Jun 2024
3.2 km away - Rooftop solar
Anson Business Park, Cheltenham Road East - Solar PanelsApproved, not yet built · 270 kW
Jun 2023
4.0 km away - Battery storage
Tredington House Farm, Tredington - Battery Energy Storage FacilityApproved, not yet built · 40 MW
Dec 2024
4.4 km away - Battery storage
Cheltenham General Hospital - Battery Energy Storage SystemApproved, not yet built · 2 MW
Sept 2021
4.7 km away - Rooftop solar
Safran Landing System, Down Hatherley Lane - Solar PanelsApproved, not yet built · 260 kW
May 2023
4.7 km away - Rooftop solar
Hatherley Manor Hotel, Down Hatherley Lane - Solar PanelsPlanning application in · 200 kW
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jun 2025
1.0 km away - Decided
A417 Missing Link Highways · Located between the Brockworth bypass and Cowley roundabout in Gloucestershire decided Nov 2022
9.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Home Farm (solar farm, 2.6 km); Wingmoor Farm (Waste AD) (anaerobic digestion, 3.7 km); Troughton Farm (solar farm, 4.1 km); Safran Landing Systems Service (biomass, 4.4 km); Meteor Business Park (battery storage, 4.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.