Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
Major
Willow Bank Road, TewkesburyRemedial works · National Grid Electricity Distribution (West Midlands) · Road closure
Nov 2026 to Nov 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
M5 Junction 10 Improvements SchemeHighways · In Gloucestershire, 5 miles to the south of Tewkesbury and 4 miles to the north-west of Cheltenham.
decided Jun 2025 12.2 km away
Decided
A417 Missing Link Highways · Located between the Brockworth bypass and Cowley roundabout in Gloucestershire
decided Nov 2022 18.8 km away
Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
application due April 2027 21.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Winchcombe & Washbourne: +19% over five years (2020 → 2025).
Council tax list: 80 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.9% in two years.