Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
551hours of spills in 2025 between them (typical neighbourhood: about 36)
63spill events counted
Severn Trent Water
Lower Lode Lane Pumping Stationinto Mill Avon61 spills, 551 hours in 2025
2.0 km away
Severn Trent Water
Tolsey Lane Csointo Mill Avon2 spills, 0 hours in 2025
1.2 km away
Severn Trent Water
Red Lane Csointo Mill Avon0 spills, 0 hours in 2025
11 planned, approved or being built and 7 running (129 MW between them). Those within 5 km are on the map above.
Rooftop solar
Dairy Way, Northway Lane, Unit 22 - Solar PanelsApproved, not yet built · 590 kW
Mar 2026 550 m away
Solar farm
Gloucester Road - Solar Carport ArrayApproved, not yet built · 220 kW
Mar 2022 2.0 km away
Solar farm
Claydon Farm - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Dec 2021 3.7 km away
Battery storage
Claydon Farm - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Dec 2021 3.7 km away
Battery storage
Tredington House Farm, Tredington - Battery Energy Storage FacilityApproved, not yet built · 40 MW
Dec 2024 4.5 km away
Solar farm
Home FarmApproved, not yet built · 25 MW
Jun 2025 5.6 km away
Battery storage
Home FarmApproved, not yet built
Jun 2025 6.5 km away
Solar farm
Home FarmApproved, not yet built · 25 MW
May 2025 6.5 km away
Battery storage
Home FarmApproved, not yet built
May 2025 6.5 km away
Battery storage
Lower Strensham - Battery Energy StorageApproved, not yet built
Sept 2022 7.4 km away
Rooftop solar
All Saints Academy, Blaisdon Way - Solar PanelApproved, not yet built · 180 kW
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
Major, planned
Manor Park, TewkesburyUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Sept 2026 to Oct 2026 500 m away
Major
Manor Park, TewkesburyUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Sept 2026 to Oct 2026 500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
M5 Junction 10 Improvements SchemeHighways · In Gloucestershire, 5 miles to the south of Tewkesbury and 4 miles to the north-west of Cheltenham.
decided Jun 2025 8.3 km away
Decided
A417 Missing Link Highways · Located between the Brockworth bypass and Cowley roundabout in Gloucestershire
decided Nov 2022 18.4 km away
Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
application due April 2027 26.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Tewkesbury West & Twyning: +25% over five years (2020 → 2025).
Council tax list: 50 homes added in the neighbourhood since April 2024.
Population (GP registrations): -2.0% in two years.