What's changing near GL10 3HP
Within 2 km, around Leonard Stanley & Uley in Stroud. Building, planning, schools, transport, prices and crime.
5new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.0%like-for-like prices in Leonard Stanley & Uley, 2024 → 2025 (council +1.4%)
-51%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 45 m²
12since energy certificates began (2008)
2in GL10 3HP itself
- Extendedcertificate 2022
- Extendedcertificate 2021
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
9hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
- Severn Trent Water
Ocean Bridge Csointo River Frome4 spills, 9 hours in 2025
1.9 km away - Severn Trent Water
Kings Stanley - Ryeford Rd South (Cso)into River Frome0 spills, 0 hours in 2025
450 m away - Severn Trent Water
Regent Street Csointo River Frome0 spills, 0 hours in 2025
1.1 km away - Severn Trent Water
Stanley Downton Csointo Trib Of River Frome0 spills, 0 hours in 2025
1.2 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 5 running (48 MW between them). Those within 5 km are on the map above.
- Solar farm
A B B Limited, Oldends Lane - Solar ArrayApproved, not yet built · 800 kW
Dec 2023
2.4 km away - Rooftop solar
Sainsburys Supermarket, Dudbridge Road - Solar PanelsPlanning application in · 240 kW
Aug 2024
2.4 km away - Rooftop solar
Science building, Dudbridge Road - Solar PanelsApproved, not yet built · 570 kW
Mar 2023
2.6 km away - Rooftop solar
Brunel Way - Solar PanelsApproved, not yet built · 450 kW
Apr 2022
2.7 km away - Rooftop solar
Delphi Diesel Systems, Brunel Way - Solar PanelsApproved, not yet built · 2 MW
May 2024
2.8 km away - Rooftop solar
Wellington House, Bath Road - Solar PanelsApproved, not yet built · 240 kW
Jan 2022
4.3 km away - Solar farm
Moreton Lane - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Apr 2022
7.5 km away - Battery storage
Moreton Lane - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Apr 2022
7.5 km away - Battery storage
Kingston Road, Slimbridge - Battery StorageApproved, not yet built · 36 MW
Jul 2024
7.7 km away - Rooftop solar
Rednock School - Solar PanelsBeing built · 210 kW
Sept 2024
7.7 km away - Rooftop solar
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
A417 Missing Link Highways · Located between the Brockworth bypass and Cowley roundabout in Gloucestershire decided Nov 2022
17.3 km away - Examinationapplication due September 2025
21.7 km away - Decideddecided Jun 2025
23.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Shipton Mill Limited, Frampton On Severn Industrial Park - Solar PanelsApproved, not yet built · 170 kW
Running nearest: Renishaw PLC Factory (rooftop solar, 2.8 km); Hillhouse Farm (solar farm, 6.1 km); Land at Box Road (solar farm, 6.2 km); Javelin Park EfW (energy from waste, 6.8 km); Markley Group (Premiere Kitckens) Biomass (biomass, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.