What's changing near FY8 3RN
Within 2 km, around Heyhouses & Park in Fylde. Building, planning, schools, transport, prices and crime.
136new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.1%like-for-like prices in Heyhouses & Park, 2024 → 2025 (council +3.5%)
+14%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
45 new homes completedhouses · Nov 2024 – Oct 2026
planned Oct 2026
250 m away - New homes
11 new homes completedhouses · Feb 2026 – Aug 2026
Aug 2026
300 m away - New homes
9 new homes completedhouses · Feb 2026 – May 2026
May 2026
300 m away - New homes
9 new homes completedhouses · Oct 2025 – Mar 2026
Mar 2026
400 m away - New homes
17 new homes completed4 flats, 13 houses · Mar 2025 – Oct 2025
Oct 2025
600 m away - New homes
11 new homes completedhouses · May 2025 – Sep 2025
Sept 2025
250 m away - New homes
12 new homes completedhouses · Feb 2025 – Sep 2025
Sept 2025
650 m away - New homes
8 new homes completedhouses · Nov 2024 – Feb 2025
Feb 2025
350 m away - New schoolApr 2022
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
17homes extended 2021–2025, typically adding 27 m²
28since energy certificates began (2008)
1in FY8 3RN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 5 running (20 MW between them). Those within 5 km are on the map above.
- Rooftop solar
National Car Parks, St Georges Road - Solar PanelsApproved, not yet built
Jul 2025
1.9 km away - Battery storage
West Moss Lane, Higher Ballam - Battery Energy Storage SystemApproved, not yet built · 30 MW
Apr 2025
2.2 km away - Solar farm
Lawns Solar FarmApproved, not yet built · 25 MW
Feb 2023
2.9 km away - Battery storage
Peel Road - Battery StorageApproved, not yet built · 20 MW
Sept 2023
3.2 km away - Solar farm
Peel Road Phase 2 - Solar FarmPlanning application in · 13 MW
Feb 2025
3.2 km away - Battery storage
Lowland Farm, Peel Road - Battery Energy Storage FacilityPlanning application in · 100 MW
Jun 2025
3.2 km away - Rooftop solar
Arnold Clark Blackpool Vauxhall, Whitehills Business Park - Solar PanelsPlanning application in · 200 kW
Jun 2026
3.4 km away - Rooftop solar
Tesco Stores, Clifton Retail Park - Solar PanelsApproved, not yet built · 700 kW
Dec 2025
3.9 km away - Rooftop solar
Blackpool Police Divisional Headquarters - Solar PanelsApproved, not yet built · 350 kW
Jun 2023
4.0 km away - Rooftop solar
St Georges School - Solar PanelsApproved, not yet built · 500 kW
Dec 2025
4.2 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major
Moorland Road, Lytham St AnnesUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Nov 2026 to Nov 2026
800 m away - Minor
Ulverston Crescent, Lytham St AnnesUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Sept 2026
3.2 km away - Decideddecided Apr 2020
10.1 km away - Decideddecided Jul 2015
16.3 km away - Pre-application
East Irish Sea Transmission ProjectElectric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent application due March 2029
21.8 km away - Decideddecided May 2015
28.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Staining Wood Farm (solar farm, 3.8 km); Land off Moss Side Lane (solar farm, 5.3 km); Carr Farm (Farm AD) (anaerobic digestion, 5.3 km); Land To The South Of Todderstaffe (solar farm, 7.5 km); Cooper House Farm (solar farm, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.