What's changing near FY7 8PU
Within 2 km, around Fleetwood Rossall & Chatsworth in Wyre. Building, planning, schools, transport, prices and crime.
0new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-3.3%like-for-like prices in Fleetwood Rossall & Chatsworth, 2024 → 2025 (council +4.7%)
-4%recorded crime, last 12 months vs the 12 before
On the map
School openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
17homes extended 2021–2025, typically adding 38 m²
33since energy certificates began (2008)
3in FY7 8PU itself
- Extendedcertificate 2023
- Extendedcertificate 2016
- Extendedcertificate 2012
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
4hours of spills in 2025 between them (typical neighbourhood: about 36)
10spill events counted
- United Utilities
South Strand Cso (Wyr0085)into Culverted Section Of Copse Brook Via A Surface Water Sewer8 spills, 4 hours in 2025
500 m away - United Utilities
Rossall School Pumping Stationinto Unnamed Dyke On Rossall School Private Land · near bathing water: Cleveleys2 spills, 0 hours in 2025
850 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
11 planned, approved or being built and 4 running (17 MW between them). Those within 5 km are on the map above.
- Battery storage
Archway Travel, Copse Road - Battery Storage FacilityApproved, not yet built
Jun 2023
900 m away - Rooftop solar
Victrex Plant, Hillhouse International Works - Solar PanelsApproved, not yet built · 390 kW
Sept 2024
3.4 km away - Energy from waste
Hillhouse Business Park - Thornton Energy Recovery CentrePlanning application in · 9 MW
Feb 2023
3.4 km away - Battery storage
Bristol Avenue - Battery Energy Storage FacilityApproved, not yet built · 25 MW
May 2021
6.2 km away - Rooftop solar
Moors Farm, Hambleton - Solar PV PanelsApproved, not yet built · 220 kW
Jul 2025
7.4 km away - Rooftop solar
Unity College, Warbreck Hill Road - Solar PVApproved, not yet built · 240 kW
Sept 2025
7.7 km away - Battery storage
Cocker Avenue - Energy storage facilityApproved, not yet built · 8 MW
Jun 2021
8.2 km away - Solar farm
Foxfield Nurseries, School Lane - Solar PanelsApproved, not yet built · 1 MW
Jul 2025
8.9 km away - Rooftop solar
Blackpool Victoria Hospital - Solar PanelsApproved, not yet built · 150 kW
Mar 2024
9.5 km away - Solar farm
Smithy Lane, Staining - Solar PV Panels & BESSPlanning application in · 40 MW
Feb 2026
9.9 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major
West Way, FleetwoodUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Jun 2026 to Nov 2026
500 m away - Major
Copse Road, FleetwoodUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Jun 2026 to Dec 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jul 2015
4.2 km away - Decideddecided Apr 2020
8.3 km away - Decideddecided Sept 2026
15.2 km away - Pre-application
East Irish Sea Transmission ProjectElectric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent application due March 2029
19.5 km away - Decideddecided Mar 2013
24.2 km away - Decideddecided Nov 2014
29.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Fleetwood Water Treatment Works (rooftop solar, 1.4 km); Jameson Road (landfill gas, 1.5 km); Thornton Waste Recovery Park (Waste AD) (anaerobic digestion, 2.0 km); Thornton Power Station (biomass, 3.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.