Country England and Wales › Region North West › Council Wyre › Neighbourhood Fleetwood South East › Postcode FY7 8HW What's changing near FY7 8HW Within 2 km, around Fleetwood South East in Wyre. Building, planning, schools, transport, prices and crime.
0 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+6.2% like-for-like prices in Fleetwood South East, 2024 → 2025 (council +4.7%)
-16% recorded crime, last 12 months vs the 12 before
On the map
School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
15 homes extended 2021–2025, typically adding 23 m²
55 since energy certificates began (2008)
7 in FY7 8HW itself
Extended certificate 2021 Extended certificate 2020 Extended certificate 2018 Extended certificate 2014 Extended certificate 2014 Extended Storm overflows within 2 km 4 storm overflows within 2 km
7 hours of spills in 2025 between them (typical neighbourhood: about 36)
15 spill events counted
United Utilities South Strand Cso (Wyr0085) into Culverted Section Of Copse Brook Via A Surface Water Sewer 8 spills, 4 hours in 2025
1.2 km away United Utilities Dock Street Cso 52567 into Copse Brook Culvert · near bathing water: Fleetwood 5 spills, 3 hours in 2025
1.6 km away United Utilities Rossall School Pumping Station into Unnamed Dyke On Rossall School Private Land · near bathing water: Cleveleys 2 spills, 0 hours in 2025
1.6 km away United Utilities Dock St Overflow into Copse Brook Culvert 0 spills, 0 hours in 2025
1.9 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 8 planned, approved or being built and 4 running (17 MW between them). Those within 5 km are on the map above.
Battery storage Archway Travel, Copse Road - Battery Storage Facility Approved, not yet built
Jun 2023 550 m away Rooftop solar Victrex Plant, Hillhouse International Works - Solar Panels Approved, not yet built · 390 kW
Sept 2024 3.6 km away Energy from waste Hillhouse Business Park - Thornton Energy Recovery Centre Planning application in · 9 MW
Feb 2023 3.6 km away Battery storage Bristol Avenue - Battery Energy Storage Facility Approved, not yet built · 25 MW
May 2021 6.9 km away Rooftop solar Moors Farm, Hambleton - Solar PV Panels Approved, not yet built · 220 kW
Jul 2025 7.5 km away Solar farm Foxfield Nurseries, School Lane - Solar Panels Approved, not yet built · 1 MW
Jul 2025 8.2 km away Rooftop solar Unity College, Warbreck Hill Road - Solar PV Approved, not yet built · 240 kW
Sept 2025 8.4 km away Battery storage Cocker Avenue - Energy storage facility Approved, not yet built · 8 MW
Jun 2021 8.6 km away Running nearest: Fleetwood Water Treatment Works (rooftop solar, 950 m); Jameson Road (landfill gas, 1.4 km); Thornton Waste Recovery Park (Waste AD) (anaerobic digestion, 2.2 km); Thornton Power Station (biomass, 4.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 2 permitted works running now or planned, 1 of them major.
Major Copse Road, Fleetwood Utility repair and maintenance works · United Utilities Water Ltd · Road closure
Jun 2026 to Dec 2026 800 m away Standard Poulton Road, Fleetwood New service connection · SP Electricity North West · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jul 2015 3.8 km away Decided decided Apr 2020 8.6 km away Decided decided Sept 2026 15.9 km away Pre-application East Irish Sea Transmission Project Electric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent application due March 2029 19.2 km away Decided decided Mar 2013 23.4 km away Decided decided Nov 2014 29.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.