What's changing near FY7 6FZ
Within 2 km, around Fleetwood South East in Wyre. Building, planning, schools, transport, prices and crime.
1new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+6.2%like-for-like prices in Fleetwood South East, 2024 → 2025 (council +4.7%)
-16%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
14homes extended 2021–2025, typically adding 21 m²
60since energy certificates began (2008)
2in FY7 6FZ itself
- Extendedcertificate 2024
- Extendedcertificate 2013
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
300hours of spills in 2025 between them (typical neighbourhood: about 36)
43spill events counted
- United Utilities
Preesall Wwtwinto River Wyre Estuary · near bathing water: Fleetwood34 spills, 279 hours in 2025
1.4 km away - United Utilities
Knott End Pumping Stationinto River Wyre Estuary · near bathing water: Fleetwood4 spills, 18 hours in 2025
1.3 km away - United Utilities
Dock Street Cso 52567into Copse Brook Culvert · near bathing water: Fleetwood5 spills, 3 hours in 2025
100 m away - United Utilities
Dock St Overflowinto Copse Brook Culvert0 spills, 0 hours in 2025
350 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
9 planned, approved or being built and 5 running (21 MW between them). Those within 5 km are on the map above.
- Battery storage
Archway Travel, Copse Road - Battery Storage FacilityApproved, not yet built
Jun 2023
1.5 km away - Rooftop solar
Victrex Plant, Hillhouse International Works - Solar PanelsApproved, not yet built · 390 kW
Sept 2024
4.0 km away - Energy from waste
Hillhouse Business Park - Thornton Energy Recovery CentrePlanning application in · 9 MW
Feb 2023
4.0 km away - Solar farm
Foxfield Nurseries, School Lane - Solar PanelsApproved, not yet built · 1 MW
Jul 2025
6.8 km away - Rooftop solar
Moors Farm, Hambleton - Solar PV PanelsApproved, not yet built · 220 kW
Jul 2025
7.2 km away - Battery storage
Bristol Avenue - Battery Energy Storage FacilityApproved, not yet built · 25 MW
May 2021
7.8 km away - Battery storage
Cocker Avenue - Energy storage facilityApproved, not yet built · 8 MW
Jun 2021
8.9 km away - Solar farm
Eagland Hill - Solar ArrayPlanning application in · 15 MW
Aug 2024
9.4 km away - Rooftop solar
Unity College, Warbreck Hill Road - Solar PVApproved, not yet built · 240 kW
Sept 2025
9.5 km away
Running nearest: Fleetwood Water Treatment Works (rooftop solar, 1.2 km); Jameson Road (landfill gas, 1.8 km); Thornton Waste Recovery Park (Waste AD) (anaerobic digestion, 2.7 km); Thornton Power Station (biomass, 4.3 km); Orchard End (wind farm, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
- Major
Victoria Street, FleetwoodUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Give and take
Jan 2027 to Jan 2027
650 m away - Standard
St Peters Place, FleetwoodUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Some carriageway incursion
Oct 2026 to Oct 2026
500 m away - Standard
Adelaide Street, FleetwoodUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Give and take
Oct 2026 to Oct 2026
550 m away - Standard
Darbishire Road, FleetwoodNew service connection · SP Electricity North West · Some carriageway incursion
Dec 2026 to Dec 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jul 2015
2.9 km away - Decideddecided Apr 2020
8.8 km away - Decideddecided Sept 2026
17.0 km away - Pre-application
East Irish Sea Transmission ProjectElectric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent application due March 2029
18.1 km away - Decideddecided Mar 2013
21.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.