What's changing near FY6 9BZ
Within 2 km, around Preesall, Stalmine & Hambleton in Wyre. Building, planning, schools, transport, prices and crime.
116new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.3%like-for-like prices in Preesall, Stalmine & Hambleton, 2024 → 2025 (council +4.7%)
-24%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedhouses · Jan 2026 – Jun 2026
Jun 2026
500 m away - New homes
24 new homes completedhouses · Jun 2025 – Apr 2026
Apr 2026
500 m away - New homes
26 new homes completedhouses · May 2025 – Dec 2025
Dec 2025
400 m away - New homes
11 new homes completedhouses · Nov 2025
Nov 2025
450 m away - New homes
9 new homes completedhouses · Jul 2025 – Sep 2025
Sept 2025
450 m away - New homes
14 new homes completedhouses · Feb 2025 – May 2025
May 2025
400 m away - New homes
14 new homes completedhouses · Nov 2024 – Mar 2025
Mar 2025
300 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 63 m²
15since energy certificates began (2008)
1in FY6 9BZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 6 running (25 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Moors Farm, Hambleton - Solar PV PanelsApproved, not yet built · 220 kW
Jul 2025
700 m away - Energy from waste
Hillhouse Business Park - Thornton Energy Recovery CentrePlanning application in · 9 MW
Feb 2023
3.6 km away - Rooftop solar
Victrex Plant, Hillhouse International Works - Solar PanelsApproved, not yet built · 390 kW
Sept 2024
3.6 km away - Battery storage
Cocker Avenue - Energy storage facilityApproved, not yet built · 8 MW
Jun 2021
3.8 km away - Solar farm
Eagland Hill - Solar ArrayPlanning application in · 15 MW
Aug 2024
5.6 km away - Solar farm
Weeton Barracks, Grantham Road - Solar PanelsBeing built · 700 kW
Feb 2025
5.9 km away - Battery storage
Bristol Avenue - Battery Energy Storage FacilityApproved, not yet built · 25 MW
May 2021
5.9 km away - Solar farm
Smithy Lane, Staining - Solar PV Panels & BESSPlanning application in · 40 MW
Feb 2026
6.2 km away - Battery storage
Smithy Lane, Staining - Solar PV Panels & BESSPlanning application in · 40 MW
Feb 2026
6.2 km away - Battery storage
Archway Travel, Copse Road - Battery Storage FacilityApproved, not yet built
Jun 2023
6.3 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Apr 2020
3.1 km away - Decideddecided Jul 2015
4.0 km away - Pre-application
East Irish Sea Transmission ProjectElectric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent application due March 2029
13.4 km away - Decideddecided Sept 2026
13.6 km away - Decideddecided Mar 2013
24.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Thornton Power Station (biomass, 3.3 km); Thornton Waste Recovery Park (Waste AD) (anaerobic digestion, 4.9 km); Jameson Road (landfill gas, 5.5 km); Land To The South Of Todderstaffe (solar farm, 5.7 km); Fleetwood Water Treatment Works (rooftop solar, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.