Country England and Wales › Region North West › Council Blackpool › Neighbourhood North East Centre › Postcode FY1 3RD What's changing near FY1 3RD Within 2 km, around North East Centre in Blackpool. Building, planning, schools, transport, prices and crime.
97 new homes completed within 2 km, last 2 years
20 homes given permission on brownfield sites since 2021
+1.9% like-for-like prices in North East Centre, 2024 → 2025 (council +3.1%)
-13% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 13 new homes completed houses · Aug 2026 – Oct 2026
planned Oct 2026 1.5 km away New homes 10 new homes completed houses · Oct 2025 – Oct 2026
planned Oct 2026 1.8 km away New homes 25 new homes completed flats · Oct 2026
Oct 2026 950 m away New homes 13 new homes completed houses · Jan 2026 – Sep 2026
Sept 2026 1.8 km away New homes 13 new homes completed houses · Jun 2025 – Jul 2026
Jul 2026 1.9 km away New school Aug 2025 1.4 km away New homes 15 new homes completed flats · Jun 2025
Jun 2025 850 m away School closed School closed: Langdale Free School Free schools, primary (closure)
Aug 2023 1.3 km away Planning permission Permission for 20 homes Land to the rear of Ma Kelly's, 44-46 Queen's Promenade, Blackpool, FY2 9RW (full planning permission) Oct 2022 1.4 km away New school Jun 2022 1.8 km away 32 homes extended 2021–2025, typically adding 22 m²
172 since energy certificates began (2008)
3 in FY1 3RD itself
Extended certificate 2023 Extended certificate 2015 Extended certificate 2014 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
0 hours of spills in 2025 between them (typical neighbourhood: about 36)
0 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 23 planned, approved or being built and 7 running (31 MW between them). Those within 5 km are on the map above.
Rooftop solar Unity College, Warbreck Hill Road - Solar PV Approved, not yet built · 240 kW
Sept 2025 1.1 km away Rooftop solar Blackpool Victoria Hospital - Solar Panels Approved, not yet built · 150 kW
Mar 2024 1.9 km away Battery storage Bristol Avenue - Battery Energy Storage Facility Approved, not yet built · 25 MW
May 2021 2.8 km away Rooftop solar Marton Mere Holiday Village, Mythop Road - Solar Panels Approved, not yet built · 300 kW
Apr 2023 3.0 km away Rooftop solar St Georges School - Solar Panels Approved, not yet built · 500 kW
Dec 2025 3.6 km away Solar farm Smithy Lane, Staining - Solar PV Panels & BESS Planning application in · 40 MW
Feb 2026 4.0 km away Battery storage Smithy Lane, Staining - Solar PV Panels & BESS Planning application in · 40 MW
Feb 2026 4.0 km away Rooftop solar Blackpool Police Divisional Headquarters - Solar Panels Approved, not yet built · 350 kW
Jun 2023 4.7 km away Rooftop solar Tesco Stores, Clifton Retail Park - Solar Panels Approved, not yet built · 700 kW
Dec 2025 4.9 km away Battery storage Cocker Avenue - Energy storage facility Approved, not yet built · 8 MW
Jun 2021 5.1 km away Road and street works within 1 km 10 permitted works running now or planned, 2 of them major.
Major Platt Street, Blackpool Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 450 m away Major, planned Grosvenor Street, Blackpool Highway improvement works · BLACKPOOL BOROUGH COUNCIL · Lane closure
Oct 2026 to Nov 2026 750 m away Standard Talbot Road, Blackpool Utility repair and maintenance works · BT · Some carriageway incursion
Nov 2026 to Dec 2026 350 m away Standard Devonshire Road, Blackpool Section 50 · BLACKPOOL BOROUGH COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 350 m away Standard Talbot Road, Blackpool Section 50 · BLACKPOOL BOROUGH COUNCIL · Lane closure
Oct 2026 to Oct 2026 350 m away Standard Talbot Road, Blackpool New service connection · SP Electricity North West · Two-way signals
Oct 2026 to Oct 2026 700 m away Standard Rear Devonshire Road And Manchester Road, Blackpool New service connection · SP Electricity North West · Some carriageway incursion
Nov 2026 to Nov 2026 900 m away Standard Manchester Road, Blackpool New service connection · SP Electricity North West · Give and take
Nov 2026 to Nov 2026 900 m away Minor Fisher Street, Blackpool Utility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 400 m away Minor Major infrastructure projects within 30 km Decided decided Apr 2020 6.0 km away Decided decided Sept 2026 6.4 km away Decided decided Jul 2015 10.0 km away Pre-application East Irish Sea Transmission Project Electric Lines · The area of Irish Sea in English waters and a land fall area reaching from Crosby at the southern end, to Fleetwood at the northern end and Penwortham at the Eastern extent application due March 2029 20.6 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Land To The South Of Todderstaffe (solar farm, 5.4 km); Thornton Power Station (biomass, 6.9 km); Staining Wood Farm (solar farm, 7.5 km); Thornton Waste Recovery Park (Waste AD) (anaerobic digestion, 7.9 km); Jameson Road (landfill gas, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.