What's changing near EX8 3EA
Within 2 km, around Exmouth Halsdon in East Devon. Building, planning, schools, transport, prices and crime.
173new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.9%like-for-like prices in Exmouth Halsdon, 2024 → 2025 (council -0.2%)
+1%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
39 new homes completed12 flats, 27 houses · Jul 2025 – Oct 2026
Oct 2026
1.7 km away - New homes
5 new homes completedhouses · Jun 2026 – Oct 2026
Oct 2026
1.8 km away - New homes
24 new homes completedhouses · Aug 2025 – Jul 2026
Jul 2026
1.7 km away - New homes
21 new homes completedhouses · Oct 2024 – Jun 2026
Jun 2026
1.7 km away - New homes
24 new homes completed12 flats, 12 houses · Mar 2025 – Apr 2026
Apr 2026
1.7 km away - New homes
12 new homes completedhouses · Aug 2025 – Nov 2025
Nov 2025
1.8 km away - New homes
14 new homes completedflats · Oct 2024 – Mar 2025
Mar 2025
2.0 km away - New homes
12 new homes completedhouses · Oct 2024 – Feb 2025
Feb 2025
1.7 km away - New homes
6 new homes completedflats · Oct 2024
Oct 2024
750 m away - New schoolSept 2024
1.1 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 22 postcodes nearby had new homes completed in the last two years.
28homes extended 2021–2025, typically adding 49 m²
52since energy certificates began (2008)
0in EX8 3EA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
1,038hours of spills in 2025 between them (typical neighbourhood: about 36)
176spill events counted
- South West Water
Hartopp Road Csointo Exe Estuary · near bathing water: Exmouth61 spills, 490 hours in 2025
1000 m away - South West Water
Phear Park Pseo/Csointo Exe Estuary · near bathing water: Exmouth35 spills, 326 hours in 2025
1000 m away - South West Water
Imperial Road Tank Csointo Exe Estuary · near bathing water: Exmouth21 spills, 161 hours in 2025
1.4 km away - South West Water
Ash Grove Csointo A Tributary Of The Exe Estuary30 spills, 41 hours in 2025
800 m away - South West Water
Exeter Road Cso - Exmouthinto Withycombe Brook29 spills, 20 hours in 2025
550 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
12 planned, approved or being built and 6 running (26 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Devon Cliffs Holiday Centre, Sandy Bay - Solar panelsApproved, not yet built · 510 kW
Mar 2023
3.6 km away - Battery storage
Blackhill Quarry, Woodbury - Battery Energy Storage FacilityApproved, not yet built · 60 MW
Jul 2023
4.2 km away - Battery storage
Higher Bagmore Farm, Ebford Lane -Battery Energy Storage SystemPlanning application in · 50 MW
Jul 2025
5.1 km away - Solar farm
Langdon Hospital, Langdon - Solar PanelsPlanning application in
Nov 2025
5.5 km away - Battery storage
Langdon Hospital, Langdon - Battery Energy Storage SystemPlanning application in
Nov 2025
5.5 km away - Rooftop solar
Darts Farm Shopping Village, Clyst St George - Solar PanelsApproved, not yet built · 200 kW
Mar 2023
6.5 km away - Rooftop solar
Westexe, Greendale Business Park - Solar PanelsApproved, not yet built · 1 MW
Feb 2024
7.5 km away - Solar farm
Winslade Park - Solar ArrayApproved, not yet built · 2 MW
Feb 2025
8.2 km away - Battery storage
Hill Barton Business Park, Clyst St Mary - Battery Energy StoragePlanning application in · 200 kW
Jun 2024
8.5 km away - Solar farm
Crealy Adventure Park, Clyst St Mary - Solar ArrayApproved, not yet built · 900 kW
Sept 20228.5 km away
Road and street works within 1 km
6 permitted works running now or planned, 5 of them major.
- Major
Hulham Road, ExmouthHighway improvement works · DEVON COUNTY COUNCIL · Two-way signals
Sept 2026 to Dec 2026
350 m away - Major, planned
Hulham Road, ExmouthHighway improvement works · DEVON COUNTY COUNCIL · Some carriageway incursion
Sept 2026 to Dec 2026
350 m away - Major
Hulham Road, ExmouthHighway improvement works · DEVON COUNTY COUNCIL · Some carriageway incursion
Sept 2026 to Dec 2026
350 m away - Major, planned
Waverley Road, ExmouthUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
650 m away - Major
Waverley Road, ExmouthUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
650 m away - Minor
Exeter Road, ExmouthUtility asset works · BT · Two-way signals
Dec 2026 to Dec 2026
300 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Bystock Solar Farm (solar farm, 2.5 km); Liverton Farm (solar farm, 2.7 km); Coombe Farm (solar farm, 3.1 km); Hogsbrook Farm - Farm AD (anaerobic digestion, 7.0 km); Enfield Farm (anaerobic digestion, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.