Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
897hours of spills in 2025 between them (typical neighbourhood: about 36)
274spill events counted
South West Water
Smugglers Lane Pseointo Babbacombe Bay(C) · near bathing water: Teignmouth Holcombe53 spills, 412 hours in 2025
150 m away
South West Water
Holcombe Pumping Stationinto Shell Cove, Lyme Bay(C) · near bathing water: Dawlish Coryton Cove33 spills, 303 hours in 2025
700 m away
South West Water
Woodland Ave Csointo Stream Dis To Lyme Bay (S) · near bathing water: Teignmouth Holcombe46 spills, 68 hours in 2025
750 m away
South West Water
Station Car Park Csointo Lyme Bay (Via Surf Wtr Sewer) · near bathing water: Teignmouth Town15 spills, 32 hours in 2025
1.9 km away
South West Water
Dawlish Breakwater Ssointo Lyme Bay (C) · near bathing water: Dawlish Town31 spills, 30 hours in 2025
1.9 km away
South West Water
Dawlish Sso (Brook Street)into Dawlish Water(S) · near bathing water: Dawlish Town41 spills, 28 hours in 2025
2.0 km away
South West Water
Barton Hill/Brunswick Csointo Dawlish Water (S) · near bathing water: Dawlish Town32 spills, 19 hours in 2025
1.9 km away
South West Water
Viaduct High Level Storm Tank Csointo Dawlish Water(C) · near bathing water: Dawlish Town8 spills, 3 hours in 2025
7 planned, approved or being built and 3 running (31 MW between them). Those within 5 km are on the map above.
Solar farm
Langdon Hospital, Langdon - Solar PanelsPlanning application in
Nov 2025 4.1 km away
Battery storage
Langdon Hospital, Langdon - Battery Energy Storage SystemPlanning application in
Nov 2025 4.1 km away
Solar farm
Court Barton Farm, Coffinswell - Solar FarmApproved, not yet built · 21 MW
Aug 2023 9.1 km away
Rooftop solar
East Golds Works, Kingsteignton Road - Solar PanelsApproved, not yet built · 1 MW
Feb 2025 9.5 km away
Rooftop solar
Devon Cliffs Holiday Centre, Sandy Bay - Solar panelsApproved, not yet built · 510 kW
Mar 2023 9.5 km away
Rooftop solar
Sibelco UK Preston Manor Works, Kingsteignton - Solar PanelsApproved, not yet built · 790 kW
Jan 2025 9.8 km away
Solar farm
Torbay Hospital, Nightingale Park - Solar Panel ArrayApproved, not yet built · 3 MW
Jun 2022 9.9 km away
Running nearest: Sawmills Solar Farm (solar farm, 5.3 km); Heathfield 'C' Landfill Scheme (landfill gas, 9.6 km); Barton Hill Industrial Park - Battery Energy Storage Facility (battery storage, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
2 permitted works running now or planned.
Standard
Old Teignmouth Road, DawlishNew service connection · National Grid Electricity Distribution (South West) · Some carriageway incursion
Oct 2026 to Oct 2026 900 m away
Minor
Teignmouth Road, TeignmouthRemedial works · BT · Two-way signals
Oct 2026 to Oct 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
Marsh Barton stationNew station in Exeter, opened July 2023
Jul 2023 16.1 km away
The longer view
Like-for-like prices in Dawlish South: +20% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.9% in two years.