Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
364hours of spills in 2025 between them (typical neighbourhood: about 36)
118spill events counted
South West Water
Exeter (Countess Wear) Stwinto River Exe Estuary(E)42 spills, 234 hours in 2025
1.6 km away
South West Water
Exeter (Countess Wear) Stwinto River Exe Estuary(E)25 spills, 96 hours in 2025
1.8 km away
South West Water
Follet Road Csointo River Exe (E)30 spills, 25 hours in 2025
1.7 km away
South West Water
Milbury Lane Pumping Stationinto Trib Of The Berry Brook11 spills, 8 hours in 2025
950 m away
South West Water
Main Road Csointo Berry Brook10 spills, 2 hours in 2025
150 m away
South West Water
Milbury Lane Pumping Stationinto Trib Of The Berry Brook0 spills, 0 hours in 2025
550 m away
South West Water
Newport Park Pumping Stationinto Trib Of River Exe (Estuarine)0 spills, 0 hours in 2025
1.7 km away
South West Water
Ferry Road Pumping Stationinto River Exe0 spills, 0 hours in 2025
32 planned, approved or being built and 8 running (41 MW between them). Those within 5 km are on the map above.
Rooftop solar
Matford Way, Matford - Solar PanelsApproved, not yet built · 230 kW
Nov 2022 2.6 km away
Rooftop solar
Darts Farm Shopping Village, Clyst St George - Solar PanelsApproved, not yet built · 200 kW
Mar 2023 3.3 km away
Rooftop solar
David Lloyd Leisure Club, Sandy Park Way - Solar PanelsApproved, not yet built · 390 kW
Sept 2023 4.0 km away
Solar farm
Exeter City Council - Solar Panel ArrayApproved, not yet built · 1 MW
Oct 2019 4.0 km away
Battery storage
Council Green Waste FacilityApproved, not yet built · 1 MW
Oct 2019 4.0 km away
Solar farm
Winslade Park - Solar ArrayApproved, not yet built · 2 MW
Feb 2025 4.3 km away
Rooftop solar
William Pollard & Co, Oak House - Solar PanelsApproved, not yet built · 190 kW
Sept 2022 4.7 km away
Rooftop solar
Howmet, Kestrel Way - Solar Photovoltaic PanelsApproved, not yet built · 400 kW
May 2025 4.9 km away
Rooftop solar
The Vapormatic Company - Solar PanelsApproved, not yet built · 150 kW
Jun 2023 4.9 km away
Battery storage
Higher Bagmore Farm, Ebford Lane -Battery Energy Storage SystemPlanning application in · 50 MW
Jul 2025 5.3 km away
Road and street works within 1 km
2 permitted works running now or planned.
Minor
Road Past Towsington Barton, ExminsterHighway improvement works · DEVON COUNTY COUNCIL · Temp obstruction 15 minute delay
Nov 2026 to Nov 2026 650 m away
Minor
Days-Pottles Lane, ExminsterHighway improvement works · DEVON COUNTY COUNCIL · Temp obstruction 15 minute delay
Nov 2026 to Nov 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
Marsh Barton stationNew station in Exeter, opened July 2023
Jul 2023 3.7 km away
The longer view
Like-for-like prices in Starcross & Exminster: +18% over five years (2020 → 2025).
Council tax list: 400 homes added in the neighbourhood since April 2024.
Population (GP registrations): +10.2% in two years.