Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
1,440hours of spills in 2025 between them (typical neighbourhood: about 36)
98spill events counted
South West Water
Ebford Pumping Stationinto River Clyst (Estuarine)98 spills, 1,440 hours in 2025
38 planned, approved or being built and 13 running (78 MW between them). Those within 5 km are on the map above.
Rooftop solar
Darts Farm Shopping Village, Clyst St George - Solar PanelsApproved, not yet built · 200 kW
Mar 2023 750 m away
Solar farm
Winslade Park - Solar ArrayApproved, not yet built · 2 MW
Feb 2025 1.4 km away
Battery storage
Higher Bagmore Farm, Ebford Lane -Battery Energy Storage SystemPlanning application in · 50 MW
Jul 2025 2.2 km away
Battery storage
Hill Barton Business Park, Clyst St Mary - Battery Energy StoragePlanning application in · 200 kW
Jun 2024 2.8 km away
Solar farm
Crealy Adventure Park, Clyst St Mary - Solar ArrayApproved, not yet built · 900 kW
Sept 2022 2.8 km away
Rooftop solar
David Lloyd Leisure Club, Sandy Park Way - Solar PanelsApproved, not yet built · 390 kW
Sept 2023 2.9 km away
Rooftop solar
Westexe, Greendale Business Park - Solar PanelsApproved, not yet built · 1 MW
Feb 2024 3.2 km away
Rooftop solar
The Vapormatic Company - Solar PanelsApproved, not yet built · 150 kW
Jun 2023 3.5 km away
Rooftop solar
Howmet, Kestrel Way - Solar Photovoltaic PanelsApproved, not yet built · 400 kW
May 2025 3.7 km away
Rooftop solar
William Pollard & Co, Oak House - Solar PanelsApproved, not yet built · 190 kW
Sept 20223.7 km away
Road and street works within 1 km
2 permitted works running now or planned.
Standard
Exmouth Road Towards Clyst St George, Clyst St GeorgeUtility asset works · BT · Lane closure
Feb 2027 to Feb 2027 450 m away
Standard
Road Past Dart Farm, Clyst St GeorgeUtility asset works · BT · Two-way signals
Feb 2027 to Feb 2027 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
Marsh Barton stationNew station in Exeter, opened July 2023
Jul 2023 5.8 km away
The longer view
Like-for-like prices in Clyst, Exton & Lympstone: +27% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.8% in two years.