Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
17storm overflows within 2 km
199hours of spills in 2025 between them (typical neighbourhood: about 36)
90spill events counted
South West Water
Lords Meadow Wwtwinto River Yeo/River Creedy16 spills, 183 hours in 2025
1.4 km away
South West Water
Hawkings Way Credition Csointo Trib Of River Creedy Via Sws21 spills, 9 hours in 2025
1.0 km away
South West Water
Jockey Hill Csointo Tributary Of Iver Creedy21 spills, 4 hours in 2025
1.0 km away
South West Water
Jewsons Yard Csointo River Yeo (S)7 spills, 1 hours in 2025
900 m away
South West Water
#N/Ainto Tributary Of River Creedy8 spills, 1 hours in 2025
1.0 km away
South West Water
Searle Street Csointo Stream (S)5 spills, 0 hours in 2025
1.0 km away
South West Water
Church Lane Combined Sewer Overflowinto Trib Of River Creedy Via Sws5 spills, 0 hours in 2025
1.0 km away
South West Water
Mill Street Combined Sewer Overflowinto Trib Of River Creedy Via Sws3 spills, 0 hours in 2025
6 planned, approved or being built and 1 running (1 MW between them). Those within 5 km are on the map above.
Anaerobic digestion
Lords Meadow Industrial Estate - Anaerobic Digestion PlantBeing built
Apr 2022 650 m away
Rooftop solar
Lords Meadow Leisure Centre - Solar Photovoltaic PanelsApproved, not yet built
Nov 2022 850 m away
Battery storage
George Hil, Avranches Avenue - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Feb 2024 2.0 km away
Solar farm
Belle Vue Road - Solar ArrayApproved, not yet built · 1 MW
Aug 2023 9.0 km away
Rooftop solar
Holland Hall, Clydesdale Road - Solar PanelsApproved, not yet built · 240 kW
Jun 2025 9.2 km away
Rooftop solar
Clannaborough Barton, Bow - Solar PanelsApproved, not yet built · 160 kW
Mar 2025 9.7 km away
Running nearest: Broadgate Solar Farm (solar farm, 10.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
Major, planned
Park Street, CreditonUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Road closure
Oct 2026 to Oct 2026 600 m away
Standard
Four Mills Lane, CreditonUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Some carriageway incursion
Nov 2026 to Nov 2026 200 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
Marsh Barton stationNew station in Exeter, opened July 2023
Jul 2023 12.5 km away
The longer view
Like-for-like prices in Crediton: +19% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.6% in two years.