Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
1,919hours of spills in 2025 between them (typical neighbourhood: about 36)
270spill events counted
South West Water
Westexe Pumping Stationinto River Exe81 spills, 1,204 hours in 2025
1.5 km away
South West Water
Little Silver Pumping Stationinto River Lowman74 spills, 622 hours in 2025
1.3 km away
South West Water
#N/Ainto River Lowman73 spills, 68 hours in 2025
650 m away
South West Water
Cowleymoor Estate Csointo Trib Of River Lowman Via Sws13 spills, 20 hours in 2025
850 m away
South West Water
#N/Ainto River Lowman7 spills, 2 hours in 2025
1000 m away
South West Water
#N/Ainto River Exe10 spills, 1 hours in 2025
1.4 km away
South West Water
#N/Ainto River Exe3 spills, 1 hours in 2025
1.5 km away
South West Water
Gold Street Csointo River Lowman3 spills, 1 hours in 2025
11 planned, approved or being built and 7 running (21 MW between them). Those within 5 km are on the map above.
Rooftop solar
Hepco Slide Systems Roof PVApproved, not yet built · 190 kW
Jun 2021 1000 m away
Rooftop solar
Heathcoat Fabrics LimitedApproved, not yet built · 190 kW
Apr 2021 1.6 km away
Rooftop solar
Heathcoat Fabrics Limited, West-Exe North - Solar PanelsApproved, not yet built · 260 kW
Jun 2024 1.6 km away
Rooftop solar
Petroc College, Bolham Road - SolarApproved, not yet built · 440 kW
Oct 2023 2.0 km away
Battery storage
Petroc, Bolham Road - Battery Storage & Air Source Heat PumpsApproved, not yet built · 1 MW
Jan 2024 2.0 km away
Solar farm
Little Toms - Solar FarmBeing built · 5 MW
Jun 2025 5.7 km away
Solar farm
Dean Hill Road - Solar FarmApproved, not yet built · 50 MW
Nov 2023 6.2 km away
Biomass
Higher Ayshford Farm, Westleigh - Biomass BoilerApproved, not yet built · 170 kW
Feb 2024 8.7 km away
Battery storage
Junction 27, Westleigh - Battery StorageApproved, not yet built · 400 MW
Apr 2024 9.4 km away
Solar farm
Broad Path - Solar PanelsPlanning application in · 4 MW
Jan 2025 9.9 km away
Battery storage
Broad Path - Battery Storage
Road and street works within 1 km
6 permitted works running now or planned, 5 of them major.
Major, planned
Horsdon Road, TivertonUtility asset works · BT · Road closure
Oct 2026 to Oct 2026 450 m away
Major, planned
Exeter Hill, TivertonUtility asset works · BT · Road closure
Jan 2027 to Jan 2027 650 m away
Major
Exeter Hill, TivertonUtility asset works · BT · Road closure
Jan 2027 to Jan 2027 650 m away
Major, planned
Westcott Road, TivertonUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Some carriageway incursion
Oct 2026 to Nov 2026 1000 m away
Major
Westcott Road, TivertonUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Some carriageway incursion
Oct 2026 to Nov 2026 1000 m away
Minor
Lazenby Road, TivertonUtility asset works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 50 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Tiverton East: +21% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -4.2% in two years.