Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
1,149hours of spills in 2025 between them (typical neighbourhood: about 36)
82spill events counted
South West Water
Stoneyford Pumping Stationinto River Ken59 spills, 931 hours in 2025
1.7 km away
South West Water
Duke Street Pumping Stationinto Cullompton Mill Leat19 spills, 218 hours in 2025
1.1 km away
South West Water
Forge Way Car Park Csointo Mill Stream (S)2 spills, 1 hours in 2025
1.2 km away
South West Water
Middle Mill Lane Csointo Mill Leat2 spills, 0 hours in 2025
1.1 km away
South West Water
#N/Ainto Cullompton Mill Leat0 spills, 0 hours in 2025
18 planned, approved or being built and 11 running (102 MW between them). Those within 5 km are on the map above.
Solar farm
Little Toms - Solar FarmBeing built · 5 MW
Jun 2025 1.6 km away
Solar farm
Dean Hill Road - Solar FarmApproved, not yet built · 50 MW
Nov 2023 4.2 km away
Rooftop solar
Donaldson Timber Engineering, Kentisbeare - Solar PanelsApproved, not yet built · 150 kW
Mar 2025 4.5 km away
Rooftop solar
Homeleigh - Solar Photovoltaics PanelsApproved, not yet built · 170 kW
Sept 2025 6.7 km away
Solar farm
Paytherden Solar Farm (Peradon)Being built · 49 MW
Dec 2022 6.8 km away
Rooftop solar
Hepco Slide Systems Roof PVApproved, not yet built · 190 kW
Jun 2021 7.9 km away
Rooftop solar
Heathcoat Fabrics LimitedApproved, not yet built · 190 kW
Apr 2021 8.6 km away
Rooftop solar
Heathcoat Fabrics Limited, West-Exe North - Solar PanelsApproved, not yet built · 260 kW
Jun 2024 8.6 km away
Solar farm
Broad Path - Solar PanelsPlanning application in · 4 MW
Jan 2025 8.7 km away
Battery storage
Broad Path - Battery StoragePlanning application in
Jan 2025 8.7 km away
Solar farm
Rutton Farm, Whimple - Horton Solar FarmApproved, not yet built · 50 MW
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
Marsh Barton stationNew station in Exeter, opened July 2023
Jul 2023 18.2 km away
The longer view
Like-for-like prices in Cullompton: +14% over five years (2020 → 2025).
Council tax list: 90 homes added in the neighbourhood since April 2024.
Population (GP registrations): +1.8% in two years.