Country England and Wales › Region East of England › Council Epping Forest › Neighbourhood Waltham Abbey West & Outer › Postcode EN9 2DZ What's changing near EN9 2DZ Within 2 km, around Waltham Abbey West & Outer in Epping Forest. Building, planning, schools, transport, prices and crime.
23 new homes completed within 2 km, last 2 years
9 homes given permission on brownfield sites since 2021
-3.9% like-for-like prices in Waltham Abbey West & Outer, 2024 → 2025 (council -0.3%)
+16% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
6 homes extended 2021–2025, typically adding 28 m²
10 since energy certificates began (2008)
1 in EN9 2DZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 32 planned, approved or being built and 7 running (67 MW between them). Those within 5 km are on the map above.
Rooftop solar Iceland, Solar Way - Solar Photovoltaic Array Approved, not yet built · 3 MW
Jan 2024 2.4 km away Rooftop solar Solar Way - Solar Panels Approved, not yet built · 430 kW
May 2024 2.4 km away Rooftop solar The Arena - Solar Panels Approved, not yet built · 530 kW
Aug 2024 3.7 km away Rooftop solar The Arena - Solar Panels Approved, not yet built · 530 kW
Aug 2024 3.7 km away Rooftop solar St Marys C Of E Va High School, Lieutenant Ellis Way - Solar Panels Approved, not yet built · 9 MW
Jul 2025 3.9 km away Rooftop solar Lockfield Avenue Solar Being built · 200 kW
Dec 2020 4.4 km away Rooftop solar Delta Park Industrial Estate, Millmarsh Lane - Solar Panels Approved, not yet built · 270 kW
Jul 2023 4.5 km away Rooftop solar The Scout Association, Gilwell Park - Solar Panels Approved, not yet built · 150 kW
Nov 2025 4.8 km away Solar farm Gilwell Park, Bury Road - Solar Panels Approved, not yet built · 620 kW
May 2024 4.8 km away Rooftop solar Johnson Matthey, Jeffreys Road - Solar Panels Planning application in · 700 kW
May 2026 5.1 km away Rooftop solar Road and street works within 1 km 6 permitted works running now or planned, 2 of them major.
Major, planned Parklands, Waltham Abbey Utility asset works · CADENT GAS LIMITED · Road closure
Mar 2027 to Apr 2027 350 m away Major Quaker Lane, Waltham Abbey Utility asset works · THAMES WATER · Road closure
Nov 2026 to Nov 2026 750 m away Standard Church Street, Waltham Abbey Utility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away Minor Crooked Mile, Waltham Abbey Highway repair and maintenance works · ESSEX COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 150 m away Minor Crooked Mile, Waltham Abbey Highway repair and maintenance works · ESSEX COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 800 m away Minor Broomstick Hall Road, Waltham Abbey Highway improvement works · ESSEX COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Feb 2017 8.8 km away Decided decided Apr 2014 10.5 km away Decided decided May 2022 19.8 km away Decided Silvertown Tunnel Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018 21.3 km away Decided decided Sept 2014 21.9 km away Pre-application application due March 2028 23.2 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Waltham Point Distribution Centre (rooftop solar, 1.7 km); Cattlegate Farm Biogas (Farm AD) (anaerobic digestion, 7.8 km); Deephams Sewerage Treatment Works (anaerobic digestion, 8.0 km); Ratty's Lane Sustainable Energy Facility (Waste AD) (anaerobic digestion, 8.2 km); Edmonton EcoPark EfW (energy from waste, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.