Country England and Wales › Region East of England › Council Broxbourne › Neighbourhood Wormley & Turnford › Postcode EN8 0XP What's changing near EN8 0XP Within 2 km, around Wormley & Turnford in Broxbourne. Building, planning, schools, transport, prices and crime.
26 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+4.2% like-for-like prices in Wormley & Turnford, 2024 → 2025 (council +1.8%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 29 m²
20 since energy certificates began (2008)
3 in EN8 0XP itself
Extended certificate 2023 Extended certificate 2019 Extended certificate 2018 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 31 planned, approved or being built and 4 running (9 MW between them). Those within 5 km are on the map above.
Rooftop solar St Marys C Of E Va High School, Lieutenant Ellis Way - Solar Panels Approved, not yet built · 9 MW
Jul 2025 3.3 km away Rooftop solar Iceland, Solar Way - Solar Photovoltaic Array Approved, not yet built · 3 MW
Jan 2024 4.7 km away Rooftop solar Solar Way - Solar Panels Approved, not yet built · 430 kW
May 2024 4.7 km away Rooftop solar Fibron B X, Rd Park - Solar Panels Approved, not yet built · 710 kW
Jul 2025 4.9 km away Energy from waste Ratty's Lane Sustainable Energy Facility (ACT) Being built · 10 MW
Jul 2016 5.6 km away Rooftop solar The Arena - Solar Panels Approved, not yet built · 530 kW
Aug 2024 6.0 km away Rooftop solar The Arena - Solar Panels Approved, not yet built · 530 kW
Aug 2024 6.0 km away Rooftop solar Lockfield Avenue Solar Being built · 200 kW
Dec 2020 6.7 km away Rooftop solar Delta Park Industrial Estate, Millmarsh Lane - Solar Panels Approved, not yet built · 270 kW
Jul 2023 7.1 km away Solar farm East End Solar Farm Approved, not yet built · 50 MW
May 2024 7.3 km away Rooftop solar Johnson Matthey, Jeffreys Road - Solar Panels
Road and street works within 1 km 4 permitted works running now or planned, 2 of them major.
Major Landau Way, Turnford Utility asset works · THAMES WATER · Two-way signals
Aug 2026 to Oct 2026 500 m away Major Juniper Close, Turnford Utility asset works · THAMES WATER · Multi-way signals
Sept 2026 to Nov 2026 850 m away Minor Cheshunt Wash, Cheshunt Utility repair and maintenance works · THAMES WATER · Multi-way signals
Oct 2026 to Oct 2026 450 m away Minor Oldfield Drive, Cheshunt Utility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Feb 2017 11.3 km away Decided decided Apr 2014 12.9 km away Decided decided May 2022 22.7 km away Decided decided Sept 2014 24.1 km away Decided Silvertown Tunnel Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018 24.3 km away Pre-application application due March 2028 26.1 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Waltham Point Distribution Centre (rooftop solar, 4.5 km); Ratty's Lane Sustainable Energy Facility (Waste AD) (anaerobic digestion, 5.6 km); Cattlegate Farm Biogas (Farm AD) (anaerobic digestion, 6.6 km); Rye Meads Sewerage Treatment Works (anaerobic digestion, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.