What's changing near EN8 0TE
Within 2 km, around Cheshunt Coopers Walk in Broxbourne. Building, planning, schools, transport, prices and crime.
26new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.7%like-for-like prices in Cheshunt Coopers Walk, 2024 → 2025 (council +1.8%)
+30%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 30 m²
21since energy certificates began (2008)
0in EN8 0TE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
31 planned, approved or being built and 4 running (9 MW between them). Those within 5 km are on the map above.
- Rooftop solar
St Marys C Of E Va High School, Lieutenant Ellis Way - Solar PanelsApproved, not yet built · 9 MW
Jul 2025
3.1 km away - Rooftop solar
Iceland, Solar Way - Solar Photovoltaic ArrayApproved, not yet built · 3 MW
Jan 2024
4.7 km away - Rooftop solar
Solar Way - Solar PanelsApproved, not yet built · 430 kW
May 2024
4.7 km away - Rooftop solar
Fibron B X, Rd Park - Solar PanelsApproved, not yet built · 710 kW
Jul 2025
5.0 km away - Energy from waste
Ratty's Lane Sustainable Energy Facility (ACT)Being built · 10 MW
Jul 2016
5.7 km away - Rooftop solar
The Arena - Solar PanelsApproved, not yet built · 530 kW
Aug 2024
6.0 km away - Rooftop solar
The Arena - Solar PanelsApproved, not yet built · 530 kW
Aug 2024
6.0 km away - Rooftop solar
Lockfield Avenue SolarBeing built · 200 kW
Dec 2020
6.7 km away - Rooftop solar
Delta Park Industrial Estate, Millmarsh Lane - Solar PanelsApproved, not yet built · 270 kW
Jul 2023
7.1 km away - Rooftop solar
Chalkmill Drive - Solar PanelsPlanning application in · 480 kW
May 2026
7.5 km away - Solar farm
East End Solar Farm
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major
Landau Way, TurnfordUtility asset works · THAMES WATER · Two-way signals
Aug 2026 to Oct 2026
650 m away - Major
Juniper Close, TurnfordUtility asset works · THAMES WATER · Multi-way signals
Sept 2026 to Nov 2026
1000 m away - Minor
Cheshunt Wash, CheshuntUtility repair and maintenance works · THAMES WATER · Multi-way signals
Oct 2026 to Oct 2026
300 m away - Minor
Oldfield Drive, CheshuntUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Feb 2017
11.2 km away - Decideddecided Apr 2014
12.9 km away - Decideddecided May 2022
23.0 km away - Decideddecided Sept 2014
24.0 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
24.3 km away - Pre-applicationapplication due March 2028
26.2 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Waltham Point Distribution Centre (rooftop solar, 4.6 km); Ratty's Lane Sustainable Energy Facility (Waste AD) (anaerobic digestion, 5.7 km); Cattlegate Farm Biogas (Farm AD) (anaerobic digestion, 6.3 km); Rye Meads Sewerage Treatment Works (anaerobic digestion, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.