Country England and Wales › Region East of England › Council Broxbourne › Neighbourhood Flamstead End › Postcode EN7 6NR What's changing near EN7 6NR Within 2 km, around Flamstead End in Broxbourne. Building, planning, schools, transport, prices and crime.
144 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+4.8% like-for-like prices in Flamstead End, 2024 → 2025 (council +1.8%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 44 new homes completed houses · Dec 2025 – Oct 2026
planned Oct 2026 250 m away New homes 42 new homes completed houses · Apr 2026 – Oct 2026
planned Oct 2026 1.9 km away New homes 7 new homes completed houses · Nov 2025 – Aug 2026
Aug 2026 1.7 km away New homes 18 new homes completed houses · Nov 2024 – May 2026
May 2026 1.8 km away New homes 20 new homes completed houses · Jun 2025 – Mar 2026
Mar 2026 2.0 km away New homes 5 new homes completed houses · Dec 2024 – Mar 2025
Mar 2025 1.8 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
12 homes extended 2021–2025, typically adding 45 m²
13 since energy certificates began (2008)
1 in EN7 6NR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 24 planned, approved or being built and 6 running (19 MW between them). Those within 5 km are on the map above.
Rooftop solar St Marys C Of E Va High School, Lieutenant Ellis Way - Solar Panels Approved, not yet built · 9 MW
Jul 2025 3.9 km away Rooftop solar Queenswood School, Shepherds Way - Solar Panels Approved, not yet built · 160 kW
Aug 2023 5.7 km away Rooftop solar Iceland, Solar Way - Solar Photovoltaic Array Approved, not yet built · 3 MW
Jan 2024 7.0 km away Rooftop solar Solar Way - Solar Panels Approved, not yet built · 430 kW
May 2024 7.0 km away Rooftop solar County Hall - Solar panels Approved, not yet built · 200 kW
Apr 2022 7.3 km away Rooftop solar Fibron B X, Rd Park - Solar Panels Approved, not yet built · 710 kW
Jul 2025 7.4 km away Energy from waste Ratty's Lane Sustainable Energy Facility (ACT) Being built · 10 MW
Jul 2016 7.5 km away Rooftop solar Mercedes Benz Of Hertford, Foxholes Business Park - Solar Panels Approved, not yet built · 150 kW
Mar 2023 7.7 km away Hydro Castle Weir Planning application in · 200 kW
Oct 2019 7.8 km away Rooftop solar Stephen Austin & Sons, Caxton Hill - Solar Panels Approved, not yet built · 270 kW
Jun 2023 7.9 km away Rooftop solar Road and street works within 1 km 1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Feb 2017 12.4 km away Decided decided Apr 2014 13.8 km away Decided decided Sept 2014 24.1 km away Decided Silvertown Tunnel Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018 25.8 km away Decided decided Apr 2025 25.8 km away Decided decided May 2022 26.8 km away Decided decided Oct 2013 27.1 km away Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Cattlegate Farm Biogas (Farm AD) (anaerobic digestion, 3.8 km); Waltham Point Distribution Centre (rooftop solar, 7.4 km); Ratty's Lane Sustainable Energy Facility (Waste AD) (anaerobic digestion, 7.5 km); Potters Bar Solar Farm (solar farm, 8.5 km); Rye Meads Sewerage Treatment Works (anaerobic digestion, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.