Country England and Wales › Region East of England › Council Broxbourne › Neighbourhood Wormley & Turnford › Postcode EN10 6PD What's changing near EN10 6PD Within 2 km, around Wormley & Turnford in Broxbourne. Building, planning, schools, transport, prices and crime.
28 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+4.2% like-for-like prices in Wormley & Turnford, 2024 → 2025 (council +1.8%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 5 new homes completed 4 flats, 1 houses · Jan 2025 – Sep 2026
Sept 2026 650 m away New homes 6 new homes completed houses · Oct 2024 – Dec 2024
Dec 2024 450 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
17 homes extended 2021–2025, typically adding 26 m²
28 since energy certificates began (2008)
0 in EN10 6PD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 29 planned, approved or being built and 6 running (15 MW between them). Those within 5 km are on the map above.
Rooftop solar Fibron B X, Rd Park - Solar Panels Approved, not yet built · 710 kW
Jul 2025 3.1 km away Energy from waste Ratty's Lane Sustainable Energy Facility (ACT) Being built · 10 MW
Jul 2016 3.6 km away Rooftop solar St Marys C Of E Va High School, Lieutenant Ellis Way - Solar Panels Approved, not yet built · 9 MW
Jul 2025 5.1 km away Solar farm East End Solar Farm Approved, not yet built · 50 MW
May 2024 5.7 km away Rooftop solar Icon Harlow, Third Avenue - Solar Photovoltaic Panels Approved, not yet built · 700 kW
Jun 2023 6.6 km away Rooftop solar Iceland, Solar Way - Solar Photovoltaic Array Approved, not yet built · 3 MW
Jan 2024 6.7 km away Rooftop solar Solar Way - Solar Panels Approved, not yet built · 430 kW
May 2024 6.7 km away Rooftop solar Gsk Icon Harlow - Solar Photovoltaic Panels Approved, not yet built · 580 kW
Nov 2023 6.7 km away Rooftop solar Icon Industrial Estate - Solar Panels Approved, not yet built · 500 kW
Jun 2023 6.8 km away Rooftop solar Mercedes Benz Of Hertford, Foxholes Business Park - Solar Panels Approved, not yet built · 150 kW
Mar 2023 7.0 km away Road and street works within 1 km 10 permitted works running now or planned, 6 of them major.
Major, planned Caldecot Way, Broxbourne Utility asset works · CADENT GAS LIMITED · Give and take
Oct 2026 to Nov 2026 250 m away Major Caldecot Way, Broxbourne Utility asset works · CADENT GAS LIMITED · Give and take
Oct 2026 to Nov 2026 250 m away Major, planned Winford Drive, Broxbourne Utility asset works · CADENT GAS LIMITED · No carriageway incursion
Sept 2026 to Dec 2026 300 m away Major Winford Drive, Broxbourne Utility asset works · CADENT GAS LIMITED · No carriageway incursion
Sept 2026 to Dec 2026 300 m away Major, planned Winford Drive, Broxbourne Utility asset works · CADENT GAS LIMITED · Give and take
Sept 2026 to Dec 2026 350 m away Major Winford Drive, Broxbourne Utility asset works · CADENT GAS LIMITED · Give and take
Sept 2026 to Dec 2026 350 m away Standard Cozens Lane East, Wormley Utility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Nov 2026 150 m away Standard Westlea Close, Wormley Highway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Some carriageway incursion
Nov 2026 to Dec 2026 650 m away Standard Fairfield Drive, Wormley Disconnection or alteration of supply · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026 800 m away Minor Major infrastructure projects within 30 km Decided decided Feb 2017 13.3 km away Decided decided Apr 2014 14.9 km away Decided decided May 2022 23.7 km away Decided decided Sept 2014 26.1 km away Decided Silvertown Tunnel Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018 26.3 km away Pre-application application due March 2028 28.1 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Ratty's Lane Sustainable Energy Facility (Waste AD) (anaerobic digestion, 3.6 km); Rye Meads Sewerage Treatment Works (anaerobic digestion, 4.9 km); Waltham Point Distribution Centre (rooftop solar, 6.5 km); Cattlegate Farm Biogas (Farm AD) (anaerobic digestion, 7.8 km); Brazier Landfill Scheme (landfill gas, 9.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.