Within 2 km, around Hackney Marshes in Hackney. Building, planning, schools, transport, prices and crime.
1,231new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+10.7%like-for-like prices in Hackney Marshes, 2024 → 2025 (council +3.1%)
+9%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
9 new homes completedflats · Oct 2026
planned Oct 2026 2.0 km away
New homes
21 new homes completed18 flats, 3 houses · Oct 2025 – Oct 2026
planned Oct 2026 1.7 km away
New homes
16 new homes completedflats · Apr 2026 – Oct 2026
Oct 2026 1.4 km away
New homes
6 new homes completedflats · Oct 2026
Oct 2026 1.7 km away
New homes
7 new homes completedflats · Oct 2026
Oct 2026 1.6 km away
New homes
9 new homes completedflats · Jul 2026
Aug 2026 1.4 km away
New homes
19 new homes completedflats · Jul 2026
Aug 2026 1.4 km away
New homes
14 new homes completedflats · Jul 2026
Jul 2026 1.5 km away
New homes
21 new homes completedflats · Jul 2026
Jul 2026 1.5 km away
New homes
22 new homes completedflats · Mar 2026 – Jul 2026
Jul 2026 1.4 km away
New homes
19 new homes completedflats · Mar 2026 – Jul 2026
Jul 2026 1.4 km away
New homes
17 new homes completedflats · Mar 2026 – Jul 2026
Jul 2026 1.5 km away
New homes
Planning applications within 500 m
31applications in the last 12 months
24approved · 1 refused
6still being decided
2net new homes in approved schemes since 2023
Application Under Consideration
19, ASHENDEN ROAD, E5 0DPErection of a single storey ground floor wrap-around extension with glazed roofHackney 2026/1706 · Householder
Sept 2026 350 m away
Application Under Consideration
126, GLYN ROAD, E5 0JEProposed ground floor side infill and rear extension with, rear dormer and outrigger extension and rooflightsHackney 2026/1981 · Householder
Sept 2026 400 m away
Application Under Consideration
74, GLYN ROAD, E5 0JDErection of a rear dormer; installation of two front rooflights and the erection of roof extension above the existing outrigger. Hackney 2026/1913 · Householder
Sept 2026 450 m away
Application Under Consideration
DAUBENEY CHILDRENS CENTRE, DAUBENEY ROAD, E5 0EGErection of ground floor extension to infill central courtyard.Hackney 2026/1823 · All Other
Aug 2026 200 m away
Approved
6, TREHURST STREET, E5 0EBAlteration to the ground floor rear elevation including new sliding doors and replacement of existing rooflights to the side-infill extension.Hackney 2026/1719 · Householder
Aug 2026 300 m away
Refused
Unit E1, REAR OF 166 TO 178, GLYN ROAD, E5 0JEPrior Approval for change of use from commercial, business and service use (Class E) to 23 x self-contained residential unit (Class C3) under Class MAHackney 2026/1713 · Prior Approval
Aug 2026 400 m away
Approved
45, MEESON STREET, E5 0EAPartial demolition of the existing building and erection of a single-storey side and rear extension, together with a roof extension to provide an additional storey, including the installation of two rear dormer windows and front rooflights and fenestration alterations.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
10hours of spills in 2025 between them (typical neighbourhood: about 36)
2spill events counted
Thames Water
Auckland Road Pumping Station Tanksinto Trib Of The Dagenham Brook2 spills, 10 hours in 2025
31, GLYN ROAD, E5 0JBApplication for a lawful development certificate (Proposed) for the erection of an L shaped dormer on the rear roof slope and rear outrigger and two front elevation rooflights.Hackney 2026/0907 · All Other
Apr 2026 500 m away
Approved
36, Trehurst Street, E5 0EB36 Trehurst StreetHackney 2026/0399 · All Other
Apr 2026 250 m away
Approved
1, COLNE ROAD, E5 0HRReplacement of existing side return extension tiled roof with a glazed roof and alterations to the rear elevation ground floor doors and windows.Hackney 2026/0759 · Householder
Apr 2026 400 m away
Approved
27, Colne Road, E5 0HRErection of single storey rear side infill extensionHackney 2026/0717 · Householder
Apr 2026 250 m away
Approved
27, Colne Road, E5 0HR27 Colne Road Loft ConversionHackney 2026/0718 · All Other
5, SUNNYHILL CLOSE, E5 0STIt is proposed to replace the existing single glazed timber casement windows with New Double Glazed uPVC units, enhancing the thermal efficiency and thermal comfort for the tenants. The new windows will be installed within existing window openings and will follow the same fenestration patterns. The windows to be installed are to match the existing style and pattern of the timber windows to maintaiHackney 2025/2712 · All Other
Mar 2026 450 m away
Approved
1, Colne Road, E5 0HRColne roadHackney 2026/0511 · All Other
Mar 2026 400 m away
Approved
26, Colne Road, E5 0HR26 COLNE ROAD LONDON E5 0HR(CLP-LOFT)Hackney 2026/0477 · All Other
Mar 2026 250 m away
Approved
74, Adley Street, E5 0DZErection of a single-storey rear side extensionHackney 2026/0426 · Householder
Feb 2026 50 m away
Approved
1-46, KEYWORTH CLOSE, E5 0SSProposed replacement of the existing single glazed timber casement windows with new double glazed uPVC windows within existing openings.Hackney 2025/2725 · All Other
Feb 2026 450 m away
Approved
11, TREHURST STREET, E5 0EBErection of single storey ground floor side infill extension.Hackney 2026/0236 · Householder
Feb 2026 250 m away
Approved
87, Roding Road, E5 0DRApplication for a lawful development certificate (existing) for the use of property as HMO (Use Class C4)Hackney 2026/0116 · All Other
Jan 2026 350 m away
Approved
58, MANDEVILLE STREET, E5 0BPReplacement of existing single glazed timber casement windows with double glazed uPVC windows to front, rear and flank elevations.Hackney 2025/2719 · All Other
Jan 2026 450 m away
Approved
18, Sunnyhill Close, E5 0STReplacement of timber casement windows with new uPVC casement windows.Hackney 2025/2787 · All Other
Dec 2025 500 m away
Approved
195, Homerton High Street, E9 6BB195 High St Homerton CLOPUD C3 to C4 revisedHackney 2025/2757 · All Other · 1 homes proposed
Dec 2025 450 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
The Highway - 114 Flats, Office Accomodation & Self Storage FacilityApproved, not yet built · 180 kW
Aug 2023 5.2 km away
Rooftop solar
Citibank, 25 Canada Square - Office Fit-Out & RefurbishmentApproved, not yet built
5.5 km away
Running nearest: King's Yard (biomass, 2.7 km); Holly Street - Solar PV Panels (rooftop solar, 2.8 km); Bywaters’ Materials Recovery Facility Solar Array (rooftop solar, 3.9 km); Advent Way - Solar Panels (rooftop solar, 6.7 km); Edmonton EcoPark EfW (energy from waste, 7.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided Nov 2025 14.4 km away
Decided
M25 junction 28 improvementsHighways · To the west of Brentwood in Essex, at the intersection of the M25, the A12 and the A1023
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.