School closed: St Mary's Church of England Primary School, Stoke NewingtonVoluntary aided school, primary (closure)
Aug 2025 1.9 km away
New homes
5 new homes completedflats · Jul 2025
Jul 2025 1.3 km away
New homes
6 new homes completedflats · Jul 2025
Jul 2025 1.3 km away
New homes
22 new homes completedflats · Apr 2025 – May 2025
May 2025 1.4 km away
New homes
5 new homes completedflats · May 2025
May 2025 1.4 km away
New homes
12 new homes completedflats · Apr 2025
Apr 2025 1.9 km away
New homes
Planning applications within 500 m
47applications in the last 12 months
24approved · 5 refused
13still being decided
43net new homes in approved schemes since 2023
Application Under Consideration
51, CLEVELEYS ROAD, E5 9JWNon material amendment to planning permission 2025/1803 dated 07/10/2025 for the 'Erection of a ground floor side return extension and the rearrangement of the stepped approach the front of the property with additional planters'. The application seeks to removal of a small recess of the extension where it adjoins the main body of the house.Hackney 2026/2027 · All Other
Sept 2026 400 m away
Application Under Consideration
8, ALCESTER CRESCENT, E5 9PXReplacement of existing single glazed timber framed windows with double glazed timber framed windows, and external refurbishmentHackney 2026/2021 · Householder
62, GUNTON ROAD, E5 9JSPrior approval for a larger homes extension for the erection of a single storey ground floor rear extension measuring up to 6.0m in depth, 3.0m height to eaves, and 3.3m maximum height.Hackney 2026/1928 · Prior Approval
Sept 2026 350 m away
Application Under Consideration
6, MUSTON ROAD, E5 9LHReplacement of existing single glazed timber framed sash and casement windows to front, side and rear elevations with new double glazed uPVC framed casement windows. Replacement of existing single glazed timber framed rear door with new double glazed uPVC framed rear door.Hackney 2026/1875 · All Other
Sept 2026 200 m away
Application Under Consideration
17, DETMOLD ROAD, E5 9NJErection of three-storey side extension to facilitate enlargement of existing residential dwelling.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
31hours of spills in 2025 between them (typical neighbourhood: about 36)
5spill events counted
Thames Water
Low Hall Farm Storm Tanksinto Dagenham Brook5 spills, 31 hours in 2025
1.8 km away
Thames Water
Markfield Park Cso / Stonebridge Bkinto River Lee0 spills, 0 hours in 2025
New school: Clockhouse Primary SchoolOther independent school, other independent school
Dec 2024 1.7 km away
New homes
15 new homes completedflats · Nov 2024
Nov 2024 900 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 37 postcodes nearby had new homes completed in the last two years.
Hackney 2026/1931 · All Other
Sept 2026 150 m away
Application Under Consideration
27, SACH ROAD, E5 9LJReplacement of existing single glazed timber framed sash and casement windows to front, side and rear elevations with new double glazed uPVC framed casement windows. Replacement of existing single glazed timber framed rear doors with new double glazed uPVC framed rear doors.Hackney 2026/1874 · All Other
Sept 2026 100 m away
Application Under Consideration
15, SACH ROAD, E5 9LJReplacement of single glazed timber sash windows like for like for double glazed timber sash windows as well as external redecorationsHackney 2026/1796 · Householder
Aug 2026 150 m away
Application Under Consideration
27, KNIGHTLAND ROAD, E5 9HRErection of roof extension above 2 storey rear outriggerHackney 2026/1801 · All Other
Aug 2026 300 m away
No Objection to Proposal (OBS only)
73, ICKBURGH ROAD, E5 8AFG1 X5 Lime trees: Reduce by 3m in height Justification: Routine maintenance Hackney 2026/1646 · All Other
Jul 2026 450 m away
Refused
38, GUNTON ROAD, E5 9JSPrior approval for a larger homes extension for the erection of a single storey ground floor rear extension measuring up to 6.0m in depth, 3m height to eaves, and 3.3m maximum height, and a single storey ground floor rear/side extension measuring up to 5.01m in depth, 3m height to eaves, and 3.3m maximum heightHackney 2026/1584 · Prior Approval
Jul 2026 350 m away
Application Under Consideration
GARAGE SITE NORTH OF THE TRAM DEPOT, CASIMIR ROADDemolition of the existing garages and construction of five new homes, together with hard and soft landscaping and refuse / recycling and cycle storageHackney 2026/1513 · All Other · 5 homes proposed
Jul 2026 500 m away
Approved
27, WARWICK GROVE, E5 9HXExcavation to provide a basement level and creation of lightwells to the side with stairwells for emergency egress.Hackney 2026/1417 · All Other
Jul 2026 250 m away
Refused
11, Second Floor And Attic Floor Flat, HIGH HILL FERRY, E5 9HGChange of openings on the second floor and insertion of new windows on the second and third floors in the North East elevation and the insertion of a Velux roof light.Hackney 2026/1396 · All Other
Jul 2026 400 m away
Approved
OUTSIDE 142 AND 142A, UPPER CLAPTON ROAD, E5 9JZProposed New Communications Kiosk with integrated advertising display and defibrillator to replace existing Telephone kiosk, plus associated Telephone kiosk removal.Hackney 2026/1332 · All Other
Jun 2026 300 m away
Refused
17, DETMOLD ROAD, E5 9NJErection of three-storey side extension to facilitate enlargement of existing residential dwelling.Hackney 2026/1156 · Householder
Jun 2026 150 m away
Approved
23, MORESBY ROAD, E5 9LEErection of a single storey ground floor wrap-around extension with sukkah roofHackney 2026/1173 · Householder
27, WARWICK GROVE, E5 9HXSubmission of details pursuant to conditions 3 (SUDs) attached to planning permission ref 2025/1075 dated 21/08/2025.Hackney 2026/1120 · All Other
May 2026 250 m away
Approved
46, UPPER CLAPTON ROAD, E5 9JPGround floor rear/side infill extension to Flat 1. One new front roof light to Flat 3. Hackney 2026/1109 · All Other
May 2026 450 m away
Application Under Consideration
102, REIGHTON ROAD, E5 8SGChange of use from existing 6-person House in Multiple Occupation (Use Class C4) to an 8-person large House in Multiple Occupation (Sui Generis); excavation to extend the lower ground floor with the creation of a new front lightwell and downward extension of the front bay window; together with the erection of a single-storey timber-clad cycle and refuse enclosure to the rear.Hackney 2026/1047 · All Other · 1 homes proposed
May 2026 450 m away
Approved
11, ALDEBURGH CLOSE, E5 9PZErection of a single storey ground floor rear extensionHackney 2026/1033 · Householder
50, Moreton Close, E5 9EP50 Moreton CloseHackney 2026/0749 · All Other
Apr 2026 200 m away
Approved
51, Cleveleys Road, E5 9JW51 Cleveleys RoadHackney 2026/0768 · All Other
Apr 2026 400 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
University Of East London - 650 Student accommodation & Teaching and learningBeing built · 180 kW
Mar 2026 5.0 km away
Rooftop solar
Wood Green Shopping City, High Road - Solar ArrayApproved, not yet built · 310 kW
Mar 2026 5.1 km away
Running nearest: Holly Street - Solar PV Panels (rooftop solar, 2.7 km); King's Yard (biomass, 4.7 km); Advent Way - Solar Panels (rooftop solar, 5.3 km); Bywaters’ Materials Recovery Facility Solar Array (rooftop solar, 5.8 km); Edmonton EcoPark EfW (energy from waste, 5.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided Nov 2025 16.2 km away
Decided
M25 junction 28 improvementsHighways · To the west of Brentwood in Essex, at the intersection of the M25, the A12 and the A1023
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.