Looking around…
What's changing near E17 7DE
Within 2 km, around Walthamstow Market & South Grove in Waltham Forest. Building, planning, schools, transport, prices and crime.
468new homes completed within 2 km, last 2 years
300homes given permission on brownfield sites since 2021
+7.4%like-for-like prices in Walthamstow Market & South Grove, 2024 → 2025 (council +3.1%)
-3%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedflats · Oct 2026
Oct 2026
350 m away - School closed
School closed: Walthamstow Montessori SchoolOther independent school, other independent school (closure)
Jun 2026
1.8 km away - New homes
18 new homes completedflats · May 2026
May 2026
1.9 km away - New homes
44 new homes completedflats · Mar 2026
Mar 2026
1.8 km away - New homes
27 new homes completedflats · Feb 2026
Feb 2026
1.8 km away - New homes
7 new homes completedflats · Feb 2025 – Feb 2026
Feb 2026
1.9 km away - New homes
24 new homes completedflats · Feb 2026
Feb 2026
1.8 km away - New homes
8 new homes completedflats · Feb 2026
Feb 2026
1.5 km away - New homes
94 new homes completedflats · May 2025 – Dec 2025
Dec 2025
1.9 km away - New homes
53 new homes completedflats · Sep 2025 – Nov 2025
Nov 2025
1.8 km away - New homes
12 new homes completedflats · Nov 2025
Nov 2025
2.0 km away - New homes
37 new homes completedflats · Sep 2025 – Oct 2025
Oct 2025
1.8 km away
Planning applications within 500 m
43applications in the last 12 months
29approved · 6 refused
6still being decided
201net new homes in approved schemes since 2023
- Application Under Consideration
14, THE CRESCENT, E17 8ABLawful Development Certificate (Proposed) - Construction of dormer roof extension to main rear roof, and roof extension above two storey outrigger, with installation of two roof lights to front roof slope.Waltham Forest 262087 · All Other
Sept 2026
400 m away - Approved
24, PRETORIA AVENUELawful Development Certificate (Proposed) - Amalgamation of two self-contained flats to form a single dwellinghouse.Waltham Forest 261821 · All Other · 1 homes proposed
Jul 2026
0 m away - Approved
33, WALPOLE ROAD, E17 6PSLawful Development Certificate (Proposed) - Construction of dormer roof extension to main rear roof and rear out rigger, together with installation of three roof lights to front roof slope.Waltham Forest 261794 · All Other
Jul 2026
450 m away - Approved
57, HERVEY PARK ROAD, E17 6LJConstruction of a single storey rear extension and first floor rear extension. Waltham Forest 261656 · Householder
Jul 2026
400 m away - Approved
26A, HERVEY PARK ROAD, E17 6LJLawful Development Certificate (Proposed) - Construction of dormer roof extension to main rear roof, together with installation of two roof lights to front roof slope. Waltham Forest 261607 · All Other
Jun 2026
450 m away - Approved
46, THE CRESCENT, E17 8ABConstruction of a single storey wraparound rear extension. Waltham Forest 261485 · Householder
Jun 2026
450 m away - Application Under Consideration
86homes extended 2021–2025, typically adding 26 m²
148since energy certificates began (2008)
4in E17 7DE itself
- Extendedcertificate 2021
- Extendedcertificate 2017
- Extendedcertificate 2014
- Extendedcertificate 2009
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
145hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
- Thames Water
St Andrews Road, Black Horse Laneinto Dagenham Brook6 spills, 114 hours in 2025
1.2 km away - Thames Water
Low Hall Farm Storm Tanksinto Dagenham Brook5 spills, 31 hours in 2025
850 m away - Thames Water
Markfield Park Cso / Stonebridge Bkinto River Lee0 spills, 0 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
64 planned, approved or being built and 6 running (62 MW between them). Those within 5 km are on the map above.
- Solar farm
Coppermill Works - Solar ArrayPlanning application in · 680 kW
Jul 2022
800 m away - Rooftop solar
Compass West Estate, West Road - Solar PV PanelsPlanning application in · 240 kW
Jun 2024
3.1 km away - Rooftop solar
New Spitalfields Market, Allen House - Solar PanelsApproved, not yet built · 230 kW
Apr 2026
3.2 km away - Energy from waste
North London Heat and Power (Edmonton EcoPark Replacement)Being built · 70 MW
Oct 2022
3.4 km away - Rooftop solar
Eley Road - Solar panelsApproved, not yet built · 300 kW
Jun 2022
3.4 km away - Rooftop solar
Homerton University Hospital, Homerton Grove - Solar PV PanelsApproved, not yet built · 330 kW
Feb 2026
3.7 km away - Rooftop solar
Workstown Industrial Estate, Princes Road - Solar PanelsApproved, not yet built · 300 kW
Aug 2023
4.3 km away - Rooftop solar
Churchfields Junior School, Churchfields - Solar PanelsApproved, not yet built · 170 kW
Oct 2023
4.3 km away - Rooftop solar
Nightingale Primary School, Ashbourne Avenue -Solar PanelsApproved, not yet built · 210 kW
Jun 2025
4.6 km away - Rooftop solar
Westfield Stratford City, Montfichet Road - Solar PanelsApproved, not yet built · 330 kW
Aug 20234.7 km away
Road and street works within 1 km
11 permitted works running now or planned, 5 of them major.
- Major, planned
Warner Road, WalthamstowUtility repair and maintenance works · THAMES WATER · Road closure
Nov 2026 to Nov 2026
350 m away - Major
Warner Road, WalthamstowUtility repair and maintenance works · THAMES WATER · Road closure
Nov 2026 to Nov 2026
350 m away - Major, planned
High Street, WalthamstowHighway improvement works · LONDON BOROUGH OF WALTHAM FOREST · Stop/go boards
Sept 2026 to Mar 2027
400 m away - Major
High Street, WalthamstowHighway improvement works · LONDON BOROUGH OF WALTHAM FOREST · Stop/go boards
Sept 2026 to Mar 2027
400 m away - Major
Vernon Road, WalthamstowUtility asset works · THAMES WATER · Road closure
Sept 2026 to Oct 2026
500 m away - Standard
Albert Road, WalthamstowDisconnection or alteration of supply · UK POWER NETWORKS EASTERN & LONDON · Some carriageway incursion
Oct 2026 to Oct 2026
950 m away - Minor
Arkley Road, WalthamstowUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Minor
Chester Road, WalthamstowUtility asset works · THAMES WATER · Some carriageway incursion
Jan 2027 to Jan 2027
650 m away - Minor
Exeter Road, WalthamstowUtility asset works · THAMES WATER · Some carriageway incursion
Nov 2026 to Nov 2026
700 m away
Major infrastructure projects within 30 km
- Decideddecided Apr 2014
2.5 km away - Decideddecided Feb 2017
4.0 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
9.5 km away - Decideddecided Sept 2014
9.8 km away - Pre-applicationapplication due March 2028
11.2 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
15.5 km away - Decided
Transport schemes within 20 km
- TransportMay 2022
12.3 km away - Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
12.5 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
13.2 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
13.5 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
13.8 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
16.1 km away
New homes
11 new homes completedflats · Sep 2025
Sept 2025
1.8 km away
New homes12 new homes completed9 flats, 3 houses · Mar 2025 – Jun 2025
Jun 2025
1.3 km away New homes14 new homes completedhouses · Nov 2024 – Jun 2025
Jun 2025
2.0 km away New homes77 new homes completedflats · Feb 2025
Mar 2025
1.9 km away Planning permissionFeb 2021
700 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 30 postcodes nearby had new homes completed in the last two years.
21, Ground Floor, ST JAMES STREET, E17 7PJInstallation of an extraction flue to the rear of 21 St James Street, Walthamstow, London E17 7PJ.Waltham Forest 261503 · All Other
Jun 2026
150 m away
Approved46, THE CRESCENT, E17 8ABLawful Development Certificate (Proposed) - Construction of dormer roof extension to main rear roof, and roof extension above two storey outrigger, with installation of two roof lights to front roof slope. Waltham Forest 261484 · All Other
Jun 2026
450 m away Application Under Consideration56, EDWARD ROAD, E17 6LUVariation of condition 2 (approved plans) attached to planning permission reference 240826 granted 17/02/2025 to allow for alterations to the arrangement of first floor windows (House A and B) and internal layout.Waltham Forest 261186 · All Other
Jun 2026
400 m away Approved43, PRETORIA AVENUE, E17 7DRLawful Development Certificate (Proposed) - Construction of roof extension above two storey outrigger, with installation of two roof lights to front roof slope. Waltham Forest 261175 · All Other
May 2026
150 m away Approved19A, 19 A and 19 B, BLACKHORSE ROAD, E17 7AHReplacement of the existing windows and doors with new double glazed UPVC windows to all elevations, a composite door front entrance door and two UPVC french patio doors to the rear elevation for both 19a and 19b Blackhorse Road.Waltham Forest 261161 · All Other
May 2026
100 m away Approved72 - 74, 72-74, High Street, E17 7LDHIST - Cycle-RefuseWaltham Forest 261100 · All Other
May 2026
250 m away Application Under Consideration15, Lime Street, E17 6LGSingle Storey rear extensionWaltham Forest 261101 · Householder
May 2026
450 m away Refused57, WALPOLE ROAD, E17 6PSConstruction of a single storey rear extension with roof lantern.Waltham Forest 261081 · Householder
May 2026
400 m away Withdrawn17, THE CRESCENT, E17 8ABLawful Development Certificate (Proposed) - Construction of rear dormer roof extension, extension above two storey outrigger and installation of two roof-lights to front.Waltham Forest 261086 · All Other
May 2026
450 m away Approved32, MANSFIELD ROAD, E17 6PJLawful Development Certificate (Proposed) - Construction of dormer roof extension to main rear roof (with French doors and safety railings), and roof extension above two storey outrigger, with installation of three roof lights to front roof slope. Waltham Forest 261082 · All Other
May 2026
500 m away Refused33, WALPOLE ROAD, E17 6PSLawful Development Certificate (Proposed) - Construction of dormer roof extension to main rear roof and extension above two storey rear outrigger, together with installation of two roof-lights at front roof. Waltham Forest 261065 · All Other
Apr 2026
450 m away Approved33, WALPOLE ROAD, E17 6PSConstruction of a single storey rear wrap-around extension.Waltham Forest 261066 · Householder
Apr 2026
450 m away Approved15, ICKWORTH PARK ROAD, E17 6LNLawful development certificate (Proposed) for the construction of a rear dormer extension to the main roof, extension above the two storey rear outrigger and installation of two roof-lights to the front roof slope.Waltham Forest 261062 · All Other
Apr 2026
400 m away Approved77, COPPERMILL LANE, E17 7HAConstruction of a single storey rear infill extension and single storey rear outbuilding. Alterations to the fenestration involving the installation of replacement windows to the front and rear elevations, new rear patio door and removal of rear chimney.Waltham Forest 261049 · Householder
Apr 2026
300 m away Approved75, Hazelwood Road, E17 7AJ75 Hazelwood Road - CLDWaltham Forest 260985 · All Other
Apr 2026
300 m away Approved57, Hervey Park Road, E17 6LJGround Rear extension with internal alteration, floor plan redesign and all associated works 57 Hervey Park Road, E17 6LJWaltham Forest 260925 · Householder
Apr 2026
400 m away Refused85, Ritchings Avenue, E17 6LDProposed ground floor side infill extension, first-floor rear extension, internal alterations and all associated works at 85 Ritchings Ave, E17 6LDWaltham Forest 260832 · Householder
Mar 2026
350 m away Application Under Consideration119, Chewton Road, E17 7DNConversion of the existing garage into habitable space, together with modest front and rear extensions to the existing garage footprint.Waltham Forest 260549 · Householder
Mar 2026
250 m away Approved103, Lynmouth Road, E17 8AGEtraction of single storey wrap around rear extension with maximum height 3.2 m and eaves height 2.35m.Waltham Forest 260587 · All Other
Mar 2026
500 m away Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solarWoodbridge High School, St Barnabas Road - Solar PanelsApproved, not yet built · 540 kW
Oct 2024
5.0 km away Rooftop solarMaybank Road - Solar PanelsApproved, not yet built · 160 kW
Aug 2025
5.2 km away Running nearest: Advent Way - Solar Panels (rooftop solar, 3.4 km); Edmonton EcoPark EfW (energy from waste, 3.8 km); Deephams Sewerage Treatment Works (anaerobic digestion, 4.9 km); Holly Street - Solar PV Panels (rooftop solar, 5.2 km); King's Yard (biomass, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Higham Hill Road, WalthamstowUtility asset works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
950 m away
MinorHigham Hill Road, WalthamstowUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided Nov 2025
15.9 km away
Decideddecided May 2022
20.3 km away Pre-applicationapplication due March 2027
24.8 km away Decideddecided Mar 2025
28.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.