1,063new homes completed within 2 km, last 2 years
145homes given permission on brownfield sites since 2021
-1.4%like-for-like prices in Canary Wharf, 2024 → 2025 (council -1.2%)
+3%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
209 new homes completedflats · Sep 2026
Sept 2026
1.1 km away - New homes
135 new homes completedflats · Aug 2026
Sept 2026
1.2 km away - New homes
72 new homes completedflats · Mar 2026 – May 2026
May 2026
1.2 km away - New homes
30 new homes completedflats · Apr 2026
Apr 2026
2.0 km away - New homes
9 new homes completedflats · Apr 2026
Apr 2026
2.0 km away - New homes
50 new homes completedflats · Nov 2025
Dec 2025
1.7 km away - New homes
35 new homes completedflats · Dec 2025
Dec 2025
1.8 km away - New homes
5 new homes completedflats · Jun 2025 – Oct 2025
Oct 2025
1.4 km away - New homes
15 new homes completedflats · Oct 2025
Oct 2025
1.9 km away - New homes
7 new homes completedflats · Oct 2025
Oct 2025
2.0 km away - New homes
40 new homes completedflats · Oct 2025
Oct 2025
1.9 km away - New homes
60 new homes completedflats · May 2025
Jun 2025
1.6 km away - New homes
Planning applications within 500 m
37applications in the last 12 months
31approved · 2 refused
2still being decided
49net new homes in approved schemes since 2023
- Application Under Consideration
Queen Of The Isle Apartments, 1 East Ferry Road, LondonExisting cladding to be replaced with non-combustible material matching existing appearance. Existing decking to be replaced with A2 fire rated material matching on a like for like basis.Tower Hamlets PA/26/01395/NC · All Other
Aug 2026
200 m away - Application Under Consideration
Land South of 1-5 & 10 Bank Street, London, E14 4BGRetention of existing cofferdam structure at 1-5 Bank Street and 10 Bank Street for a temporary period of 10 yearsTower Hamlets PA/26/01396/NC · All Other
Aug 2026
400 m away - Approved
1 Newfoundland Place, Canary Wharf, LONDON E14 4BNTemporary change of use of the restaurant unit at ground and first floor level to residential amenity space for a period of 5 years.Tower Hamlets PA/26/01376/NC · All Other
Aug 2026
450 m away - Approved
Flat 9 to 24, 1 Hutchings Street, London E14 8JYApplication for certificate of lawfulness in respect of proposed works comprise the remediation of the existing external wall insulation and render system to a building that has received technical eligibility under the Cladding Safety Scheme.Tower Hamlets PA/26/01235/NC · All Other
Aug 2026
150 m away - Approved
Cascades Tower, 4 Westferry Road, London E14Installation of 2no. new 22kWh twin pod EV charging points to Cascades and Quayside car park area.Tower Hamlets PA/26/00928/NC · All Other
Jul 2026
250 m away - Approved
Cascades Tower, 4 Westferry Road, London, E14Installation of 2no. new 22kWh twin pod EV charging points to Cascades and Quayside car park area.
35homes extended 2021–2025, typically adding 21 m²
93since energy certificates began (2008)
3in E14 8LZ itself
- Extendedcertificate 2025
- Extendedcertificate 2022
- Extendedcertificate 2020
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
52hours of spills in 2025 between them (typical neighbourhood: about 36)
8spill events counted
- Thames Water
Deptford Storm Relief Csointo R.Thames ( Tidal )3 spills, 46 hours in 2025
1.7 km away - Thames Water
Earl Ps Csointo R.Thames ( Tidal )2 spills, 5 hours in 2025
850 m away - Thames Water
North East St Csointo Tidal Thames2 spills, 1 hours in 2025
1.7 km away - Thames Water
Isle Of Dogs Pumping Station Csointo River Thames(Tidal)1 spills, 0 hours in 2025
1.4 km away - Thames Water
Holloway Storm Relief Csointo R.Thames ( Tidal )0 spills, 0 hours in 2025
1.4 km away - Thames Water
Ratcliffe Highway Limekiln Csointo Tidal Thames0 spills, 0 hours in 2025
1.5 km away - Thames Water
Bell Wharf Csointo Tidal Riverthames0 spills, 0 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
66 planned, approved or being built and 10 running (76 MW between them). Those within 5 km are on the map above.
- Solar farm
Hedgehog Grove Solar Farm - Solar PanelsPlanning application in · 98 MW
Mar 2026
650 m away - Rooftop solar
Citibank, 25 Canada Square - Office Fit-Out & RefurbishmentApproved, not yet built
750 m away - Wind farm
The O2 Arena - Wind turbinesApproved, not yet built · 3 MW
Sept 2021
2.3 km away - Rooftop solar
John Orwell Sports Centre, Tench Street - Solar PanelsApproved, not yet built · 270 kW
Apr 2025
2.4 km away - Rooftop solar
The Bermondsey ProjectApproved, not yet built · 240 kW
Jun 2020
2.6 km away - Rooftop solar
The Highway - 114 Flats, Office Accomodation & Self Storage FacilityApproved, not yet built · 180 kW
Aug 2023
2.6 km away - Rooftop solar
Segro Park Canning, Town Bidder Street, Unit 2 - Solar PanelsApproved, not yet built · 240 kW
Jul 2025
2.7 km away - Rooftop solar
City Of London Academy - Solar PV PanelsApproved, not yet built · 190 kW
May 2022
2.9 km away - Rooftop solar
Millennium Retail Park - Flats & Retail SpacePlanning application in · 340 kW
May 2024
3.1 km away - Battery storage
Custom House - Battery Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025
3.7 km away
Road and street works within 1 km
7 permitted works running now or planned, 2 of them major.
- Major, planned
Marsh Wall, LondonUtility asset works · CADENT GAS LIMITED · Multi-way signals
Nov 2026 to Nov 2026
650 m away - Major, planned
Marsh Wall, LondonUtility repair and maintenance works · THAMES WATER · Road closure
Oct 2026 to Nov 2026
700 m away - Standard
Marsh Wall, LondonUtility asset works · THAMES WATER · Multi-way signals
Oct 2026 to Oct 2026
650 m away - Standard
Marsh Wall, LondonDisconnection or alteration of supply · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away - Minor
Alpha Grove, LondonUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
350 m away - Minor
Westferry Road, LondonUtility asset works · BT · Lane closure
Oct 2026 to Oct 2026
800 m away - Minor
Salter Road, LondonUtility asset works · HUTCHISON 3G LTD · Two-way signals
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
2.7 km away - Pre-applicationapplication due March 2028
2.7 km away - Decideddecided Sept 2014
6.0 km away - Decideddecided Apr 2014
11.6 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
12.5 km away - Decideddecided Nov 2025
12.9 km away - Decided
Transport schemes within 20 km
- Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
7.4 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
8.3 km away - Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
10.1 km away - TransportMay 2022
10.4 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
15.5 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
15.8 km away
Approved45 Westferry Road, London, E14 8JHApplication for certificate of Lawfulness in respect of proposed use as a day nursery falls within Use Class E(f), which is within the same Use Class E as the existing lawful use of the building. As such, the proposal does not constitute development under Section 55 of the Town and Country Planning Act 1990, as there is no material change of use between different use classes.Tower Hamlets PA/26/00854/NC · All Other
Jul 2026
100 m away ApprovedEve House, 6 St Lukes Mews, London, E14 8LTApplication for Certificate of Lawfulness in respect of proposed removal of combustible cladding materials, including timber, render systems, and high pressure laminate (HPL) panels and their replacement with non combustible fibre cement cladding, render, and Rockpanel across all elevationsTower Hamlets PA/26/00397/NC · All Other
Mar 2026
200 m away Approved72, 72 Manilla Street, London, E14 8LGNon-Material amendment to planning permission ref: PA/17/00191, Dated 18/10/2017, to change description of proposal from: Original description: Demolition of the existing garage (light industrial B1(c) - NIA 100 sq m) single storey building on the site and the erection of an 8 storey building to accommodate a ground floor B1a office unit (42 sq m) and 6 flats (1 x 3 bedroom and 5 x 1 bedroom) onTower Hamlets PA/26/00345/S · All Other
Feb 2026
250 m away ApprovedCar Park Spaces, Admirals Way, London, E14Minor Material Amendment to Condition 3 of Planning Permission ref: PA/24/01987, Dated 13/02/2025. Amendments include: Extend the hours of operation to 7.30 -18.00 Mondays - Fridays, and 9.00-18.00 Saturdays - Sundays and Bank HolidaysTower Hamlets PA/26/00199/S · All Other
Feb 2026
350 m away Running nearest: SELCHP ERF (energy from waste, 2.2 km); Bywaters’ Materials Recovery Facility Solar Array (rooftop solar, 2.8 km); Thameside DC (rooftop solar, 3.8 km); King's Yard (biomass, 4.2 km); Holly Street - Solar PV Panels (rooftop solar, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.