Within 2 km, around Poplar West in Tower Hamlets. Building, planning, schools, transport, prices and crime.
1,457new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-5.3%like-for-like prices in Poplar West, 2024 → 2025 (council -1.2%)
+10%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
86 new homes completedflats · Jul 2026
Jul 2026 1.6 km away
New homes
89 new homes completedflats · Jun 2026
Jul 2026 850 m away
New homes
54 new homes completedflats · Jul 2026
Jul 2026 850 m away
New homes
42 new homes completedflats · Jun 2026 – Jul 2026
Jul 2026 1.4 km away
New homes
94 new homes completedflats · Jul 2026
Jul 2026 1.6 km away
New homes
72 new homes completedflats · Mar 2026 – May 2026
May 2026 1.4 km away
New homes
20 new homes completedflats · Apr 2026 – May 2026
May 2026 700 m away
New homes
92 new homes completedflats · Apr 2026
Apr 2026 1.3 km away
New homes
73 new homes completedflats · Feb 2026 – Apr 2026
Apr 2026 1.6 km away
New homes
30 new homes completedflats · Apr 2026
Apr 2026 700 m away
New homes
9 new homes completedflats · Apr 2026
Apr 2026 700 m away
New homes
5 new homes completedflats · Apr 2026
Apr 2026 700 m away
New homes
Planning applications within 500 m
23applications in the last 12 months
15approved · 3 refused
4still being decided
25net new homes in approved schemes since 2023
Application Under Consideration
Access road and pavements serving Malam Gardens, London, E14 0TR, Access road and pavements serving Malam Gardens, E14 0TRReplacement of existing gas street lights with LED street lights; installation of new bollards; resurfacing of road; and replacement of paving slabs to pavements.Tower Hamlets PA/26/01653/NC · All Other
Sept 2026 400 m away
Application Under Consideration
Anglesey House, Lindfield Street, London E14 6HSProposal for the installation of a new flat roof covering, including the removal of the existing curved metal profile roof and supporting framework, demolition of the existing gable walls, installation of a warm deck flat roof over the original concrete roof slab, and provision of an edge protection system to facilitate safe roof access for maintenance.Tower Hamlets PA/26/01372/NC · All Other
Sept 2026 200 m away
Application Under Consideration
Land adjacent to 27 Pigott Street, London E14 7ENRedevelopment of the site to provide two residential dwellings with associated works and landscaping.Tower Hamlets PA/26/01521/A1 · All Other · 2 homes proposed
Aug 2026 350 m away
Refused
318 Burdett Road, London, E14 7DL3 storey rear extension and roof alterations to form mansard roof. creation of 2no. flats 1no. studio and 1no. 3 bed unit over 2 floors & internal alterations. Relocation of existing flue from rear to side elevationTower Hamlets PA/26/01325/A1 · All Other · 2 homes proposed
Aug 2026 500 m away
Approved
141 Chrisp Street, London, E14 6NHRemoval of existing conservatory roof, doors and windows. Proposed replacement brick facade, infill insulation and insulated roof with roof lights.Tower Hamlets PA/26/01386/NC · Householder
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
2hours of spills in 2025 between them (typical neighbourhood: about 36)
3spill events counted
Thames Water
North East St Csointo Tidal Thames2 spills, 1 hours in 2025
1.9 km away
Thames Water
Isle Of Dogs Pumping Station Csointo River Thames(Tidal)1 spills, 0 hours in 2025
School closed: River House Montessori SchoolOther independent school, other independent school (closure)
Jun 2024 1.7 km away
School closed
School closed: South Quay CollegeFree schools alternative provision, free schools alternative provision (closure)
Aug 2023 1.6 km away
School closed
School closed: The Cherry Trees SchoolCommunity special school, community special school (closure)
Aug 2021 1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 45 postcodes nearby had new homes completed in the last two years.
Aug 2026 450 m away
Approved
Lucienne Court, 72 Lindfield Street, London, E14 6GTApplication for certificate of Lawfulness in respect of proposed replacement of existing buiding facade materials with non-combustible alternatives for fire safety purposesTower Hamlets PA/26/01032/NC · All Other
Jun 2026 50 m away
Approved
Moro Apartments, 22 New Festival Avenue, LONDON, E14 6FTApplication for Certificate of Lawfulness in respect of proposed replacement of existing building facade materials with non-combustible alternatives for fire safety purposesTower Hamlets PA/26/01031/NC · All Other
Jun 2026 50 m away
Approved
47 Upper North Street, London E14 6FYProposed x1 illuminated fascia sign.Tower Hamlets PA/26/00777/NC · All Other
Apr 2026 100 m away
Approved
47 Upper North Street, London E14 6FYReplacement of entrance doors, installation of louvres and 1no. externally illuminated fascia sign to ground floor retail unit.Tower Hamlets PA/26/00776/NC · All Other
Apr 2026 100 m away
Approved
Unit 1, 3 Birchfield Street, London, E14 8EDApplication for Certificate of Lawfullness in respect of existing use as a one storey apartment flat in continuous use as a C4 premises (House of Multiple Occupation)Tower Hamlets PA/26/00526/NC · All Other
Mar 2026 400 m away
Refused
Access road and pavements serving Malam Gardens, London, E14 0TRErection of new access gates, replacement of existing gas street lights with LED street lights, installation of new bollards, resurfacing of road, and replacement of paving slabs to pavements.Tower Hamlets PA/26/00495/NC · All Other
Mar 2026 400 m away
Approved
Flat 10, Elgin House, Ricardo Street, London, E14 6EGConstruction of a single-storey rear extension.Tower Hamlets PA/26/00430/NC · All Other
Mar 2026 200 m away
Approved
Linea Court, 30 Bow Common Lane, London, E3 4AXSubmission of details pursuant to condition no.3 (full details of the design and appearance of the fencing and gate) of planning permission ref: PA/23/00238, dated 03/09/2024Tower Hamlets PA/26/00238/S · All Other
Feb 2026 450 m away
Approved
Former Blessed John Roche Secondary School, Upper North Street, London E14Application for non-material amendment of planning permission ref: PA/10/00161, dated 21/09/2010.Non Material Amendment(s) Sought: Removal of Condition A14 to enable ground floor Units 1 and 2 of Block A of New Festival Quarter to amalgamate into one unit. Unit 3 is to remain as a separate unit.Tower Hamlets PA/26/00052/NC · All Other
Jan 2026 50 m away
Withdrawn
26 Invicta Close, London, E3 3RZReplacement of the existing timber casement windows and balcony doors with new double glazed timber unitsTower Hamlets PA/25/02253/R · All Other
Dec 2025 400 m away
Application Under Consideration
26 Invicta Close, London, E3 3RZReplacement of the existing timber casement windows and balcony doors with new double glazed timber unitsTower Hamlets PA/25/02253/NC · All Other
Dec 2025 400 m away
Approved
Flats 1-41 Clubhouse Apartments, 34 Stainsby Road. Flats 1-18 Pavillion Apartments, 44 Stainsby Road, 36, 38, 40, 42, 48, 50 Stainsby Road and 3 Lindfield Street, London, E14Application for Certificate of Lawfulness in respect of proposed remediation works to include removal of areas of present combustible materials in the building elevations and replace with non-combustible alternatives with minimal visual impact to the existing development.Tower Hamlets PA/25/02143/NC · All Other
Dec 2025 200 m away
Approved
18 Alphabet Square, London, E3 3RTRetrospective change of use from live/work unit (Sui Generis) to residential dwellinghouse (C3).Tower Hamlets PA/25/02106/A1 · All Other · 1 homes proposed
Dec 2025 500 m away
Approved
Flat 206, Ellmers Court, 4 Aqua Vista Square, LONDON, E3 4FGApplication for certificate of Lawfulness in respect of proposed use as a ancillary/incidental to residential (C3).Tower Hamlets PA/25/01975/NC · All Other
Dec 2025 400 m away
Refused
118 Chrisp Street, London, E14 6NLApplication for Minor-Material amendment to planning permission Ref: PA/25/00942, Dated 19/08/2025Minor Material amendment(s) Sought: Removal of Condition No.4 (Noise Management Plan) and Condition no.7 (Site Wide Management Plan)Tower Hamlets PA/25/01986/S · All Other
Nov 2025 500 m away
Approved
Flat 5, Charlesworth House, Dod Street, London, E14 7EESingle storey rear extension.Tower Hamlets PA/25/01957/NC · All Other
Nov 2025 400 m away
Approved
27, Land adjacent to Langdon Park Station, corner of Cording Street and Chrisp Street, 134 - 156 Chrisp Street, London E14Application for Non-Material amendment to planning permission ref: PA/17/01289, Dated 29/11/2017.Non Material amendment(s) Sought: Changes to the eastern boundary wall adjacent to the DLR platform. Introduction of a curved corner, changes to the wall height and finishing materials.Tower Hamlets PA/25/01416/S · All Other
Nov 2025 500 m away
Approved
Campion House, 9 Frances Wharf and Harley House, 11 Frances Wharf, London, E14Replacement of combustible timber decking with non combustible aluminium decking, replacement of combustible timber cladding with a non-combustible alterative, replacement of combustible EWI render system with a non-combustible EWI system (to match existing), replacement of HPL with a non-combustible alternative.Tower Hamlets PA/25/01705/NC · All Other
Oct 2025 450 m away
Approved
7, 7 Pekin Close, London, E14 6HAInstallation of solar panels to the front roof of main dwelling.Tower Hamlets PA/25/01792/NC · Householder
Oct 2025 200 m away
Approved
3 Bartlett Close, London, E14 6LHApplication for Certificate of Lawfulness in respect of proposed construction of new single storey 3m rear extensionTower Hamlets PA/25/01667/NC · All Other
Sept 2025 100 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
The Bermondsey ProjectApproved, not yet built · 240 kW
Jun 2020 3.6 km away
Rooftop solar
Millennium Retail Park - Flats & Retail SpacePlanning application in · 340 kW
May 2024 3.7 km away
Running nearest: Bywaters’ Materials Recovery Facility Solar Array (rooftop solar, 1.4 km); King's Yard (biomass, 2.7 km); SELCHP ERF (energy from waste, 3.6 km); Thameside DC (rooftop solar, 4.1 km); Holly Street - Solar PV Panels (rooftop solar, 4.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Bow Common Lane, LondonUtility asset works · CADENT GAS LIMITED · Multi-way signals
Jan 2027 to Feb 2027 950 m away
Standard
Chrisp Street, LondonSection 50 · LONDON BOROUGH OF TOWER HAMLETS · Two-way signals
Oct 2026 to Oct 2026 450 m away
Standard
Chrisp Street, LondonSection 50 · LONDON BOROUGH OF TOWER HAMLETS · Multi-way signals
Oct 2026 to Oct 2026 500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided Nov 2025 12.5 km away
Decided
M25 junction 28 improvementsHighways · To the west of Brentwood in Essex, at the intersection of the M25, the A12 and the A1023
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.