What's changing near DY9 9TJ
Within 2 km, around Dodford, Belbroughton & Romsley in Bromsgrove. Building, planning, schools, transport, prices and crime.
3new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.6%like-for-like prices in Dodford, Belbroughton & Romsley, 2024 → 2025 (council +4.5%)
+11%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
7homes extended 2021–2025, typically adding 34 m²
13since energy certificates began (2008)
3in DY9 9TJ itself
- Extendedcertificate 2023
- Extendedcertificate 2020
- Extendedcertificate 2016
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
22hours of spills in 2025 between them (typical neighbourhood: about 36)
10spill events counted
- Severn Trent Water
Hossil Lane Pumping Stationinto Windmill Pool Brook9 spills, 22 hours in 2025
1.5 km away - Severn Trent Water
Queens Hill Csointo Trib Of Drayton Pool1 spills, 1 hours in 2025
650 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
26 planned, approved or being built and 5 running (21 MW between them). Those within 5 km are on the map above.
- Solar farm
Foxwalks Solar Farm - ExtensionPlanning application in · 13 MW
Mar 2026
6.0 km away - Rooftop solar
Hollywood Bowl, Parkway - Solar PanelsApproved, not yet built · 210 kW
Sept 2024
7.2 km away - Battery storage
Illey Lane - Battery Energy StorageApproved, not yet built · 70 MW
Oct 2025
7.2 km away - Battery storage
Illeybrook Farm - Battery Energy StorageApproved, not yet built · 100 MW
Feb 2025
7.2 km away - Rooftop solar
David Lloyd Fitness Centre - Solar panelsApproved, not yet built · 210 kW
Sept 2023
7.3 km away - Rooftop solar
Morrisons Supermarket, Rubery - Solar PhotovoltaicsApproved, not yet built · 570 kW
Jan 2022
7.3 km away - Battery storage
Lowlands Farm - Battery StorageApproved, not yet built · 50 MW
Sept 2024
7.6 km away - Rooftop solar
Windsor High School And Sixth Form - Solar panelsApproved, not yet built
Apr 2021
7.8 km away - Solar farm
Foxwalks Farm, Grafton Lane - Solar FarmApproved, not yet built · 50 MW
Jul 2024
7.8 km away - Rooftop solar
Halesowen Leisure Centre, Great Cornbow - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
7.8 km away - Rooftop solar
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major
High Street, BelbroughtonUtility asset works · BT · Road closure
Nov 2026 to Nov 2026
400 m away - Major, planned
Queens Hill, BelbroughtonUtility repair and maintenance works · BT · Road closure
Feb 2027 to Feb 2027
450 m away - Minor
High Street, BelbroughtonUtility repair and maintenance works · BT · Multi-way signals
Feb 2027 to Feb 2027
300 m away - Minor
High Street, BelbroughtonHighway repair and maintenance works · WORCESTERSHIRE COUNTY COUNCIL · No carriageway incursion
Nov 2026 to Nov 2026
350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2013
10.8 km away - Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council. application due April 2027
28.1 km away - Decideddecided May 2020
28.1 km away - Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022
29.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Sandy Lane Generation Plant (landfill gas, 3.0 km); Bumble Hole Lane, Dodford - Solar PV (rooftop solar, 4.9 km); Cradley Heath (energy from waste, 8.9 km); Waresley Landfill Site (landfill gas, 9.3 km); EnviRecover (energy from waste, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.