Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
HS2: Birmingham Curzon Street stationUnder construction
under construction 18.4 km away
The longer view
Like-for-like prices in Wordsley & Buckpool: +30% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.6% in two years.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Rooftop solar
Ellowes Hall Sports College, Stickley Lane - Solar PanelsApproved, not yet built · 440 kW
Feb 2026 5.0 km away
Rooftop solar
Roundhill Anaerobic Digestion Facility, Lloyd Way - Solar PanelsApproved, not yet built · 210 kW
Oct 2025 5.1 km away
Running nearest: The Kingswinford School - Solar panels (rooftop solar, 1.8 km); Himley Wood Landfill Site (landfill gas, 3.6 km); Dudley EfW (energy from waste, 5.3 km); Cradley Heath (energy from waste, 5.5 km); Edwin Richards Landfill Scheme (landfill gas, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.