What's changing near DY10 2PP
Within 2 km, around Kidderminster Town in Wyre Forest. Building, planning, schools, transport, prices and crime.
49new homes completed within 2 km, last 2 years
45homes given permission on brownfield sites since 2021
+3.6%like-for-like prices in Kidderminster Town, 2024 → 2025 (council +2.7%)
-13%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completed1 flats, 5 houses · Sep 2026
planned Oct 2026
1.6 km away - New homes
15 new homes completed4 flats, 11 houses · May 2025
Jun 2025
1.7 km away - New homes
13 new homes completedhouses · Jan 2025 – Mar 2025
Mar 2025
700 m away - Planning permissionMar 2022
1.0 km away - Planning permissionJul 2021
1.2 km away - Planning permissionFeb 2021
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
19homes extended 2021–2025, typically adding 20 m²
38since energy certificates began (2008)
1in DY10 2PP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
43hours of spills in 2025 between them (typical neighbourhood: about 36)
69spill events counted
- Severn Trent Water
Green Street Csointo River Stour30 spills, 22 hours in 2025
1.9 km away - Severn Trent Water
Kidderminster Mill Street Csointo River Stour10 spills, 8 hours in 2025
1.1 km away - Severn Trent Water
Stourport Road Csointo River Stour9 spills, 5 hours in 2025
1.9 km away - Severn Trent Water
Park Butts Csointo River Stour12 spills, 5 hours in 2025
1.1 km away - Severn Trent Water
Coventry Street Island Csointo River Stour6 spills, 4 hours in 2025
1000 m away - Severn Trent Water
Stourport Road Syphon Csointo River Stour1 spills, 1 hours in 2025
1.9 km away - Severn Trent Water
Church Street Csointo River Stour0 spills, 0 hours in 2025
900 m away - Severn Trent Water
Kidderminster - Church Street (Cso)into River Stour0 spills, 0 hours in 2025
900 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
10 planned, approved or being built and 3 running (22 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morrisons Superstore - Solar PhotovoltaicApproved, not yet built · 450 kW
Mar 2022
1.3 km away - Rooftop solar
John Tainton, Frederick Road - Solar PV ArrayApproved, not yet built · 790 kW
May 2025
3.3 km away - Solar farm
West Midlands Safari Park - Solar developmentApproved, not yet built · 460 kW
Jul 2024
3.8 km away - Energy from waste
Kidderminster Energy and Resource ParkApproved, not yet built · 5 MW
Sept 2021
4.1 km away - Rooftop solar
Parker Place, Firs Industrial Estate, Unit 8 - Solar PV arrayApproved, not yet built · 270 kW
Apr 2025
4.4 km away - Rooftop solar
Roundhill Anaerobic Digestion Facility, Lloyd Way - Solar PanelsApproved, not yet built · 210 kW
Oct 2025
6.4 km away - Anaerobic digestion
Roundhill - Food Waste Anaerobic Digestion PlantPlanning application in
Apr 2021
7.4 km away - Rooftop solar
Conveyor Units, Sandy Lane - Solar PanelsApproved, not yet built · 180 kW
Dec 2025
7.6 km away - Battery storage
Lincomb Farm - Battery Storage FacilityPlanning application in
Sept 2023
9.0 km away - Solar farm
Norchard FarmApproved, not yet built · 9 MW
Oct 2024
9.0 km away
Running nearest: Waresley Landfill Site (landfill gas, 7.1 km); EnviRecover (energy from waste, 8.0 km); Astley Solar Farm (solar farm, 9.6 km).
Road and street works within 1 km
6 permitted works running now or planned, 4 of them major.
- Major, planned
Gilbert Scott Way, KidderminsterUtility asset works · National Grid Electricity Distribution (West Midlands) · Multi-way signals
Oct 2026 to Nov 2026
500 m away - Major
Coventry Street, KidderminsterUtility asset works · National Grid Electricity Distribution (West Midlands) · Road closure
Nov 2026 to Nov 2026
700 m away - Major, planned
The Ringway, KidderminsterUtility asset works · National Grid Electricity Distribution (West Midlands) · No carriageway incursion
Sept 2026 to Oct 2026
750 m away - Major
George Street, KidderminsterUtility asset works · National Grid Electricity Distribution (West Midlands) · Road closure
Nov 2026 to Jan 2027
1000 m away - Standard
Churchfields, KidderminsterUtility asset works · Indigo Power · Two-way signals
Oct 2026 to Oct 2026
600 m away - Minor
St Marys Ringway, KidderminsterHighway repair and maintenance works · WORCESTERSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2013
19.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.