Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
105hours of spills in 2025 between them (typical neighbourhood: about 36)
15spill events counted
Severn Trent Water
Branton Wastewater Treatment Worksinto River Torne15 spills, 105 hours in 2025
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
Morris And Co Handlers, Balby Carr Bank - Solar Pv PanelsApproved, not yet built · 270 kW
Jan 2024 7.1 km away
Battery storage
J3 Business Park - Battery Energy Storage FacilityBeing built · 10 MW
Apr 2024 7.1 km away
Running nearest: Next Distribution Centre Doncaster (rooftop solar, 4.0 km); Ikea Distribution Centre (rooftop solar, 4.3 km); Misson Solar Farm (solar farm, 6.9 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) (anaerobic digestion, 8.6 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension (anaerobic digestion, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Decided
Keadby 3 Carbon Capture Power StationGenerating Stations · Land at the Keadby Power Station Site, Trentside, Keadby, Scunthorpe, Lincolnshire, DN17 3EF
decided Dec 2022 20.3 km away
Pre-application
STEP FusionGenerating Stations · Former West Burton A Power Station Site
application due January 2029 20.9 km away
Decided
West Burton C power station Generating Stations · Within the wider West Burton Power station site, approximately 3.5km to the south of Gainsborough
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.