Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
17 planned, approved or being built and 6 running (12 MW between them). Those within 5 km are on the map above.
Solar farm
Partridge Hill Solar FarmApproved, not yet built · 33 MW
Jul 2016 4.7 km away
Rooftop solar
Yorkshire Way, Armthorpe - Solar ArrayApproved, not yet built · 990 kW
Nov 2023 4.8 km away
Rooftop solar
Haith Group Limited, Cow House Lane - Solar PanelsApproved, not yet built · 200 kW
Mar 2023 5.8 km away
Rooftop solar
Jj Foodservice Limited, Derbyshire Court - Solar PanelsApproved, not yet built · 200 kW
Aug 2023 5.8 km away
Solar farm
Warren Farm Solar Farm & Battery StorageApproved, not yet built · 50 MW
Mar 2022 7.6 km away
Battery storage
Warren Farm Solar Farm & Battery StorageApproved, not yet built
Mar 2022 7.6 km away
Rooftop solar
Iport Avenue, New Rossington Solar PanelsApproved, not yet built · 2 MW
Mar 2021 7.7 km away
Rooftop solar
Sainsburys, Thorne Road - Solar PanelsApproved, not yet built · 550 kW
May 2026 8.0 km away
Rooftop solar
Toronto Way, New Rossington Solar PanelsApproved, not yet built · 2 MW
Apr 2021 8.7 km away
Rooftop solar
Aggreko UK, Sandall Stones Road - Solar PVApproved, not yet built · 230 kW
Jul 2025 9.1 km away
Battery storage
Aggreko UK, Sandall Stones Road - Battery Energy StorageApproved, not yet built
Jul 2025 9.1 km away
Energy from waste
Running nearest: Next Distribution Centre Doncaster (rooftop solar, 5.4 km); Ikea Distribution Centre (rooftop solar, 5.6 km); Misson Solar Farm (solar farm, 5.9 km); Bootham Lane (landfill gas, 9.9 km); Bootham Lane Phase 2 (landfill gas, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
application due October 2026 9.1 km away
Recommendation
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal
BH Energy Gap - Energy Recovery FacilityApproved, not yet built · 34 MW
Aug 2022 9.3 km away
Decided
Keadby 3 Carbon Capture Power StationGenerating Stations · Land at the Keadby Power Station Site, Trentside, Keadby, Scunthorpe, Lincolnshire, DN17 3EF
decided Dec 2022 18.5 km away
Pre-application
STEP FusionGenerating Stations · Former West Burton A Power Station Site
application due January 2029 19.1 km away
Decided
West Burton C power station Generating Stations · Within the wider West Burton Power station site, approximately 3.5km to the south of Gainsborough
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.