Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
687hours of spills in 2025 between them (typical neighbourhood: about 36)
51spill events counted
Severn Trent Water
Haxey Stwinto Trib Of Ferry Drain51 spills, 687 hours in 2025
4 planned, approved or being built and 0 running. Those within 5 km are on the map above.
Rooftop solar
Linroyal Potato Processing Plant, Heckdyke - Solar PanelsApproved, not yet built · 350 kW
Feb 2023 3.3 km away
Solar farm
Misterton PSD, Stockwith Road - Solar PanelsApproved, not yet built · 420 kW
Feb 2024 5.6 km away
Rooftop solar
Gainsborough Educational Village, Sweyn Lane - Solar PV PanelsApproved, not yet built · 450 kW
Dec 2023 9.2 km away
Rooftop solar
Ping Europe Limited, Corringham Road - Solar ArrayApproved, not yet built · 300 kW
Mar 2023 9.8 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
application due October 2026 3.2 km away
Decided
West Burton C power station Generating Stations · Within the wider West Burton Power station site, approximately 3.5km to the south of Gainsborough
decided Oct 2020 12.9 km away
Pre-application
STEP FusionGenerating Stations · Former West Burton A Power Station Site
Keadby 3 Carbon Capture Power StationGenerating Stations · Land at the Keadby Power Station Site, Trentside, Keadby, Scunthorpe, Lincolnshire, DN17 3EF
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Westwoodside, Haxey & Owston Ferry: +28% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.3% in two years.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.