Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
42hours of spills in 2025 between them (typical neighbourhood: about 36)
7spill events counted
Severn Trent Water
Low Burnham - Beck Lane (Sso)into Burnham Beck7 spills, 42 hours in 2025
3 planned, approved or being built and 1 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
Linroyal Potato Processing Plant, Heckdyke - Solar PanelsApproved, not yet built · 350 kW
Feb 2023 7.8 km away
Solar farm
Pilfrey Solar Farm - Solar FarmPlanning application in · 50 MW
Aug 2025 7.9 km away
Battery storage
Chapel Lane - Energy storage facilityApproved, not yet built
Jan 2024 9.3 km away
Running nearest: North Moor Farm AD Plant (Farm AD) (anaerobic digestion, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
2 permitted works running now or planned.
Standard
Belton Road, EpworthUtility asset works · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026 450 m away
Minor
Studcross, EpworthNew service connection · KINGSTON COMMS (HULL) · No carriageway incursion
Oct 2026 to Oct 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
Keadby 3 Carbon Capture Power StationGenerating Stations · Land at the Keadby Power Station Site, Trentside, Keadby, Scunthorpe, Lincolnshire, DN17 3EF
decided Dec 2022 8.8 km away
Recommendation
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal
Tillbridge Solar ProjectGenerating Stations · Land east and south-east of Gainsborough, south of A631 and west of B1398.
decided Oct 2025 19.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.