Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
511hours of spills in 2025 between them (typical neighbourhood: about 36)
194spill events counted
Yorkshire Water
Broadway Station Csointo River Don55 spills, 158 hours in 2025
1.2 km away
Yorkshire Water
Kirton Lane Spsinto River Don (Tidal)27 spills, 144 hours in 2025
1.2 km away
Yorkshire Water
Broadway Station Csointo River Don42 spills, 117 hours in 2025
1.2 km away
Yorkshire Water
Broadway Station Csointo River Don30 spills, 60 hours in 2025
1.2 km away
Yorkshire Water
Broadway Station Csointo River Don18 spills, 18 hours in 2025
1.2 km away
Yorkshire Water
Broadway Station Csointo River Don9 spills, 6 hours in 2025
1.2 km away
Yorkshire Water
Ramskir Lane No 2 Csointo Stainforth Drain (Ditch)3 spills, 4 hours in 2025
550 m away
Yorkshire Water
Broadway Station Csointo River Don3 spills, 2 hours in 2025
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal
application due July 2025 7.1 km away
Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire
decided Sept 2018 14.3 km away
Decided
Helios Renewable Energy ProjectGenerating Stations · Land to the south west of the village of Camblesforth and to the north of the village of Hirst Court
decided Dec 2025 15.5 km away
Decided
Drax Re-powerGenerating Stations · Drax Power Station, Drax YO8 8PH, North Yorkshire
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Stainforth: +37% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.6% in two years.
Project Union: East CoastOther Pipe-lines · East Coast of England from Teesside in the north passing through North Yorkshire and the Humber region and Lincolnshire, extending into the East Midlands. Key areas of new build pipeline would be around Teesside, the Humber region and the East Midlands.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.