What's changing near DN6 9GH
Within 2 km, around Askern, Campsall & Norton in Doncaster. Building, planning, schools, transport, prices and crime.
6new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.5%like-for-like prices in Askern, Campsall & Norton, 2024 → 2025 (council +3.7%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
5homes extended 2021–2025, typically adding 31 m²
8since energy certificates began (2008)
0in DN6 9GH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
922hours of spills in 2025 between them (typical neighbourhood: about 36)
107spill events counted
- Yorkshire Water
Yws Unknown Sites Defaultinto Great Common Drain25 spills, 303 hours in 2025
500 m away - Yorkshire Water
Sso At Norton Pumping Stationinto Trib Of Swan Sike Drain21 spills, 234 hours in 2025
200 m away - Yorkshire Water
Norton No. 2 Stwinto River Went22 spills, 200 hours in 2025
800 m away - Yorkshire Water
Askern Sewage Pumping Stationinto Great Common Drain37 spills, 161 hours in 2025
1.7 km away - Yorkshire Water
Selby Road Spsinto Swan Sike Drain2 spills, 25 hours in 2025
1.3 km away - Yorkshire Water
Kirk Smeaton Stwinto River Went0 spills, 0 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
33 planned, approved or being built and 11 running (45 MW between them). Those within 5 km are on the map above.
- Solar farm
Croft Farm, Askern Road - Solar Array & Hydrogen PlantBeing built · 3 MW
May 2023
5.8 km away - Hydrogen
Croft Farm, Askern Road - Solar Array & Hydrogen PlantApproved, not yet built · 900 kW
May 2023
5.8 km away - Anaerobic digestion
Heck Hall Farm - Anaerobic Digestion PlantApproved, not yet built
Feb 2024
6.7 km away - Rooftop solar
Thomas Armstrong - Solar PanelsApproved, not yet built · 180 kW
Jul 2023
7.3 km away - Solar farm
Leys Lane - Solar PanelsPlanning application in · 50 MW
Jun 2025
7.3 km away - Rooftop solar
Upton Primary School, Waggon Lane - Solar PanelsPlanning application in · 230 kW
Oct 2025
7.4 km away - Solar farm
The Balk, Almholme - Solar FarmApproved, not yet built · 50 MW
Oct 2024
7.7 km away - Battery storage
The Balk, Almholme - Energy Storage SystemApproved, not yet built · 1,025 MW
Oct 2024
7.7 km away - Battery storage
Springfield Farm, Hensall - Battery Energy Storage FacilityApproved, not yet built · 240 MW
May 2024
7.8 km away - Solar farm
Fenwick Solar Farm & Battery StorageApproved, not yet built · 238 MW
Feb 2026
7.9 km away - Battery storage
Road and street works within 1 km
7 permitted works running now or planned, 7 of them major.
- Major, planned
Manor Close, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jun 2027 to Jun 2027
750 m away - Major, planned
West End Road, DoncasterSection 50 · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
850 m away - Major
West End Road, DoncasterSection 50 · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
850 m away - Major, planned
Fir Tree Drive, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
May 2027 to Jun 2027
850 m away - Major
Fir Tree Drive, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · No carriageway incursion
May 2027 to Jun 2027
850 m away - Major, planned
West End Road, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Apr 2027 to Jun 2027
850 m away - Major, planned
Walden Stubbs Village, Walden StubbsWorks for Rail Purposes · NETWORK RAIL · Road closure
Feb 2027 to Feb 2027
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster decided Feb 2026
5.4 km away - Decideddecided Oct 2012
5.8 km away - Decideddecided Mar 2016
7.9 km away - Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire decided Sept 2018
9.2 km away - Decideddecided Mar 2015
9.3 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
11.9 km away - Examination
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Askern Colliery solar farm (solar farm, 1.4 km); Skelbrooke Landfill Gas Project (landfill gas, 5.7 km); Celcon Blocks Ltd (wind farm, 7.3 km); Pollington Solar Farm (solar farm, 7.6 km); Elmsall Way Warehouse (rooftop solar, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.