50new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.9%like-for-like prices in Adwick le Street & Woodlands, 2024 → 2025 (council +3.7%)
-8%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
11 new homes completedhouses · Sep 2025 – Oct 2026
Oct 2026
1.9 km away - New homes
8 new homes completedhouses · Sep 2025 – Feb 2026
Feb 2026
2.0 km away - New homes
7 new homes completedhouses · Jun 2025 – Jan 2026
Jan 2026
1.9 km away - New homes
6 new homes completedhouses · Oct 2024
Oct 2024
1.3 km away - New schoolFeb 2021
650 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 19 m²
11since energy certificates began (2008)
0in DN6 7SH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
288hours of spills in 2025 between them (typical neighbourhood: about 36)
76spill events counted
- Yorkshire Water
Adwick No.2 Stwinto Mill Dike21 spills, 155 hours in 2025
900 m away - Yorkshire Water
Woodlands Doncaster Road Csointo Mill Dike26 spills, 73 hours in 2025
900 m away - Yorkshire Water
Great North Road Adwick Csointo Mill Dike16 spills, 32 hours in 2025
850 m away - Yorkshire Water
Carcroft (Skellow - Ings Lane) Spsinto Tributary Of The Skell2 spills, 24 hours in 2025
1.8 km away - Yorkshire Water
War Memorial No 2 Csointo Tributary Of Langthwaite Dyke11 spills, 5 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
35 planned, approved or being built and 9 running (35 MW between them). Those within 5 km are on the map above.
- Battery storage
Woodlands - Battery Energy StorageApproved, not yet built · 1 MW
Jul 2022
1.3 km away - Solar farm
Croft Farm, Askern Road - Solar Array & Hydrogen PlantBeing built · 3 MW
May 2023
1.8 km away - Hydrogen
Croft Farm, Askern Road - Solar Array & Hydrogen PlantApproved, not yet built · 900 kW
May 2023
1.8 km away - Rooftop solar
Don Valley Academy, Jossey Lane - Solar PV PanelsApproved, not yet built · 300 kW
Dec 2025
2.5 km away - Solar farm
The Balk, Almholme - Solar FarmApproved, not yet built · 50 MW
Oct 2024
3.8 km away - Battery storage
The Balk, Almholme - Energy Storage SystemApproved, not yet built · 1,025 MW
Oct 2024
3.8 km away - Solar farm
Butt Lane, Hooton Pagnell - Solar FarmPlanning application in · 50 MW
Dec 2025
5.2 km away - Battery storage
Butt Lane, Hooton Pagnell Battery Energy StoragePlanning application in · 30 MW
Dec 2025
5.2 km away - Battery storage
Fordtead Lane, Thorpe Marsh - Battery Energy FacilityApproved, not yet built · 180 MW
Apr 2024
5.2 km away - Solar farm
Moorhouse Grange, Moorhouse Lane - Solar FarmPlanning application in · 30 MW
Aug 2025
5.4 km away
Road and street works within 1 km
15 permitted works running now or planned, 13 of them major.
- Major
Windmill Balk Lane, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Sept 2026 to Oct 2026
100 m away - Major
Windmill Balk Lane, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Nov 2026 to Dec 2026
300 m away - Major
Doncaster Lane, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Oct 2026 to Nov 2026
300 m away - Major
Recreation Road, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
350 m away - Major
Cemetery Road, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Major, planned
Park View, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Nov 2026 to Dec 2026
400 m away - Major
Windmill Balk Lane From Police Station To Junction Village Street, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Oct 2026 to Nov 2026
400 m away - Major
Woodlands Road, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
500 m away - Major
Village Street, DoncasterUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Major infrastructure projects within 30 km
- Decideddecided Oct 2012
5.0 km away - Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster decided Feb 2026
10.6 km away - Decideddecided Mar 2016
13.4 km away - Decideddecided Mar 2015
15.9 km away - Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire decided Sept 2018
16.7 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
17.6 km away - Recommendation
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Hampole Wind Farm (wind farm, 4.5 km); Skelbrooke Landfill Gas Project (landfill gas, 4.6 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) (anaerobic digestion, 4.8 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension (anaerobic digestion, 4.8 km); Marr Windfarm (wind farm, 5.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.