What's changing near DN6 0QT
Within 2 km, around Askern, Campsall & Norton in Doncaster. Building, planning, schools, transport, prices and crime.
11new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.5%like-for-like prices in Askern, Campsall & Norton, 2024 → 2025 (council +3.7%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 28 m²
9since energy certificates began (2008)
2in DN6 0QT itself
- Extendedcertificate 2024
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
723hours of spills in 2025 between them (typical neighbourhood: about 36)
85spill events counted
- Yorkshire Water
Yws Unknown Sites Defaultinto Great Common Drain25 spills, 303 hours in 2025
2.0 km away - Yorkshire Water
Sso At Norton Pumping Stationinto Trib Of Swan Sike Drain21 spills, 234 hours in 2025
1.9 km away - Yorkshire Water
Askern Sewage Pumping Stationinto Great Common Drain37 spills, 161 hours in 2025
900 m away - Yorkshire Water
Selby Road Spsinto Swan Sike Drain2 spills, 25 hours in 2025
1000 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
30 planned, approved or being built and 10 running (38 MW between them). Those within 5 km are on the map above.
- Solar farm
Croft Farm, Askern Road - Solar Array & Hydrogen PlantBeing built · 3 MW
May 2023
4.1 km away - Hydrogen
Croft Farm, Askern Road - Solar Array & Hydrogen PlantApproved, not yet built · 900 kW
May 2023
4.1 km away - Solar farm
The Balk, Almholme - Solar FarmApproved, not yet built · 50 MW
Oct 2024
5.6 km away - Battery storage
The Balk, Almholme - Energy Storage SystemApproved, not yet built · 1,025 MW
Oct 2024
5.6 km away - Solar farm
Fenwick Solar Farm & Battery StorageApproved, not yet built · 238 MW
Feb 2026
5.9 km away - Battery storage
Fenwick Solar Farm & Battery StorageApproved, not yet built
Feb 2026
5.9 km away - Battery storage
Thorpe Marsh Power Station, Marsh Lane - Battery Energy StorageApproved, not yet built · 1,400 MW
Jan 2025
6.0 km away - Battery storage
Thorpe Marsh Power Station - Battery Energy StorageApproved, not yet built · 1,450 MW
Jan 2025
6.0 km away - Battery storage
Fordtead Lane, Thorpe Marsh - Battery Energy FacilityApproved, not yet built · 180 MW
Apr 2024
6.2 km away - Battery storage
Woodlands - Battery Energy StorageApproved, not yet built · 1 MW
Jul 2022
6.7 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2012
3.8 km away - Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster decided Feb 2026
5.2 km away - Decideddecided Mar 2016
8.0 km away - Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire decided Sept 2018
10.9 km away - Decideddecided Mar 2015
11.4 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
13.9 km away - Examination
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Askern Colliery solar farm (solar farm, 650 m); Skelbrooke Landfill Gas Project (landfill gas, 5.4 km); Trackwork Limited (EfW) (energy from waste, 7.1 km); Elmsall Way Warehouse (rooftop solar, 7.9 km); Hampole Wind Farm (wind farm, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.