Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
1,014hours of spills in 2025 between them (typical neighbourhood: about 36)
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Bentley Rise: +34% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.2% in two years.
Fenwick Solar Farm & Battery StorageApproved, not yet built · 238 MW
Feb 2026 3.8 km away
Battery storage
Fenwick Solar Farm & Battery StorageApproved, not yet built
Feb 2026 3.8 km away
Running nearest: Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) (anaerobic digestion, 2.0 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension (anaerobic digestion, 2.0 km); Trackwork Limited (EfW) (energy from waste, 4.7 km); Next Distribution Centre Doncaster (rooftop solar, 6.4 km); Ikea Distribution Centre (rooftop solar, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due October 2026 20.2 km away
Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 20.7 km away
Decided
Helios Renewable Energy ProjectGenerating Stations · Land to the south west of the village of Camblesforth and to the north of the village of Hirst Court
decided Dec 2025 21.1 km away
Examination
Light Valley SolarGenerating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
application due in February 2026 21.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.