Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
37hours of spills in 2025 between them (typical neighbourhood: about 36)
6spill events counted
Anglian Water
Healing - Poplar Road Ssointo Old Fleet Drain6 spills, 37 hours in 2025
1.9 km away
Anglian Water
Stallingborough-S Marsh Lane Spsinto Un-Named Trib Old Fleet Drain0 spills, 0 hours in 2025
43 planned, approved or being built and 7 running (56 MW between them). Those within 5 km are on the map above.
Solar farm
Stallingborough Road - Solar PV PanelsPlanning application in · 12 MW
Jul 2025 1.2 km away
Battery storage
Stallingborough Road - Battery StoragePlanning application in · 125 MW
Jul 2025 1.2 km away
Battery storage
Trondheim Way Battery energy storageBeing built · 80 MW
Jan 2023 2.4 km away
Battery storage
Trondheim Way - Battery Storage FacilityApproved, not yet built · 5 MW
Apr 2022 2.4 km away
Solar farm
Immingham Solar Farm - Solar FarmApproved, not yet built · 50 MW
May 2025 2.6 km away
Battery storage
Immingham Solar Farm - Battery Storage FacilityApproved, not yet built · 30 MW
May 2025 2.6 km away
Energy from waste
Kiln Lane Industrial Estate, Stallingborough - EFW PlantApproved, not yet built · 20 MW
Dec 2018 2.7 km away
Battery storage
Netherlands Way - Battery Energy FacilityApproved, not yet built · 80 MW
Jan 2022 2.9 km away
Solar farm
Grimsby Solar FarmBeing built · 50 MW
Jun 2025 3.0 km away
Battery storage
Europa Way - Battery Storage FacilityApproved, not yet built · 80 MW
May 2025 3.0 km away
Solar farm
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
Major
Station Road, StallingboroughWorks for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026 450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
South Humber Bank Energy CentreGenerating Stations · Land at South Humber Bank Power Station, South Marsh Road, Stallingborough, near Grimsby, DN41 8BZ
Viking CCS Pipeline Other Pipe-lines · From land south of VPI Immingham Power Plant to the Theddlethorpe Gas Terminal
decided Apr 2025 12.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.