What's changing near DN41 7RP
Within 2 km, around Laceby, Healing & Stallingborough in North East Lincolnshire. Building, planning, schools, transport, prices and crime.
64new homes completed within 2 km, last 2 years
23homes given permission on brownfield sites since 2021
-1.7%like-for-like prices in Laceby, Healing & Stallingborough, 2024 → 2025 (council +0.9%)
+23%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Jul 2026 – Sep 2026
Sept 2026
1.0 km away - New homes
14 new homes completedhouses · Nov 2024 – Jun 2026
Jun 2026
950 m away - New homes
19 new homes completedhouses · Jul 2025 – Apr 2026
Apr 2026
950 m away - New homes
8 new homes completed4 flats, 4 houses · Feb 2025 – Apr 2025
Apr 2025
950 m away - New homes
10 new homes completedhouses · Oct 2024 – Jan 2025
Jan 2025
850 m away - Planning permissionJan 2023
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
7homes extended 2021–2025, typically adding 41 m²
11since energy certificates began (2008)
1in DN41 7RP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
40hours of spills in 2025 between them (typical neighbourhood: about 36)
9spill events counted
- Anglian Water
Healing - Poplar Road Ssointo Old Fleet Drain6 spills, 37 hours in 2025
400 m away - Anglian Water
Great Coates Station Road Psinto Towns Croft Drain3 spills, 3 hours in 2025
1.8 km away - Anglian Water
Stallingborough-S Marsh Lane Spsinto Un-Named Trib Old Fleet Drain0 spills, 0 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
42 planned, approved or being built and 8 running (56 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Innovation Centre - Solar PVPlanning application in
Dec 2021
1.9 km away - Rooftop solar
Daniels Chilled Foods, Lakeside - Solar PanelsApproved, not yet built · 810 kW
Jul 2025
2.1 km away - Solar farm
Grimsby Solar FarmBeing built · 50 MW
Jun 2025
2.4 km away - Energy from waste
South Humber Bank Power StationApproved, not yet built · 95 MW
Nov 2021
2.7 km away - Rooftop solar
Armadillo Self Storage, The Deans, 1 Estate Road - Solar PhotovoltaicApproved, not yet built · 150 kW
Jun 2025
2.8 km away - Rooftop solar
Estate Road - Solar PanelsApproved, not yet built · 660 kW
May 2022
2.8 km away - Solar farm
Stallingborough Road - Solar PV PanelsPlanning application in · 12 MW
Jul 2025
3.1 km away - Battery storage
Stallingborough Road - Battery StoragePlanning application in · 125 MW
Jul 2025
3.1 km away - Rooftop solar
Freshney Green Primary Care Centre, Sorrel Road - Solar panelsApproved, not yet built · 190 kW
May 2024
3.3 km away - Rooftop solar
Hilmore Road, Laceby - Photovoltaic Solar SystemApproved, not yet built · 450 kW
May 2022
3.4 km away - Battery storage
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due July 2027
2.7 km away - Decideddecided Nov 2021
2.8 km away - Decideddecided Feb 2025
4.7 km away - Decideddecided Oct 2024
4.9 km away - Decided
VPI Immingham OCGTGenerating Stations · Site at and adjacent to the existing VPI Immingham Power Station, Rosper Road, Immingham DN40 3DZ decided Aug 2020
8.6 km away - Decideddecided Feb 2015
9.3 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: HSH Coldstores, Estate Road - Solar Panels (rooftop solar, 2.4 km); Newlincs EfW (energy from waste, 2.6 km); Grimsby West, Birchin Way - Solar Array (rooftop solar, 3.8 km); Immingham Landfill Scheme (landfill gas, 4.2 km); Immingham (landfill gas, 4.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.