Country England and Wales › Region Yorkshire and The Humber › Council North East Lincolnshire › Neighbourhood Immingham & Habrough › Postcode DN40 1QS What's changing near DN40 1QS Within 2 km, around Immingham & Habrough in North East Lincolnshire. Building, planning, schools, transport, prices and crime.
52 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.9% like-for-like prices in Immingham & Habrough, 2024 → 2025 (council +0.9%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 18 new homes completed houses · Apr 2026 – Oct 2026
planned Oct 2026 1.9 km away New homes 8 new homes completed houses · Apr 2026 – Oct 2026
planned Oct 2026 1.9 km away New homes 7 new homes completed houses · Mar 2026 – Jun 2026
Jun 2026 1.9 km away New homes 18 new homes completed houses · Apr 2026
Apr 2026 450 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
1 homes extended 2021–2025, typically adding 16 m²
3 since energy certificates began (2008)
1 in DN40 1QS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 40 planned, approved or being built and 6 running (16 MW between them). Those within 5 km are on the map above.
Rooftop solar Abp Border Control Post Building, Queens Road - Solar Photovoltaic Panel Approved, not yet built · 430 kW
Oct 2023 1.2 km away Solar farm Immingham Solar Farm - Solar Farm Approved, not yet built · 50 MW
May 2025 1.3 km away Battery storage Immingham Solar Farm - Battery Storage Facility Approved, not yet built · 30 MW
May 2025 1.3 km away Wind farm Port Of Immingham West Riverside, Immingham Docks - Wind Turbines Approved, not yet built · 4 MW
Mar 2026 1.3 km away Rooftop solar Shed 27, Alexandra Road, South Immingham - Solar Photovoltaic Panels Approved, not yet built · 1 MW
Sept 2023 1.3 km away Rooftop solar Shed 10, Alexandra Road South, Immingham Docks - Solar Panels Approved, not yet built · 1 MW
Sept 2023 1.3 km away Wind farm Port Of Immingham West Riverside, Immingham Docks - Wind Turbines Approved, not yet built · 4 MW
Dec 2025 1.3 km away Energy from waste North Beck Energy Centre Approved, not yet built · 50 MW
Oct 2018 1.3 km away Battery storage Netherlands Way - Battery Energy Facility Approved, not yet built · 80 MW
Jan 2022 1.5 km away Battery storage Trondheim Way Battery energy storage Being built · 80 MW
Jan 2023 1.6 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2024 800 m away Decided decided Feb 2025 2.0 km away Decided VPI Immingham OCGT Generating Stations · Site at and adjacent to the existing VPI Immingham Power Station, Rosper Road, Immingham DN40 3DZ decided Aug 2020 3.6 km away Decided decided Nov 2021 4.0 km away Decided decided Dec 2013 4.4 km away Pre-application application due July 2027 4.4 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Immingham Landfill Scheme (landfill gas, 850 m); Immingham (landfill gas, 850 m); Newlincs EfW (energy from waste, 2.8 km); HSH Coldstores, Estate Road - Solar Panels (rooftop solar, 6.9 km); Grimsby West, Birchin Way - Solar Array (rooftop solar, 7.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.