Country England and Wales › Region Yorkshire and The Humber › Council North East Lincolnshire › Neighbourhood Great Coates & The Willows › Postcode DN37 9SE What's changing near DN37 9SE Within 2 km, around Great Coates & The Willows in North East Lincolnshire. Building, planning, schools, transport, prices and crime.
65 new homes completed within 2 km, last 2 years
117 homes given permission on brownfield sites since 2021
+2.4% like-for-like prices in Great Coates & The Willows, 2024 → 2025 (council +0.9%)
-8% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 24 new homes completed houses · Jan 2026 – Oct 2026
Oct 2026 1.7 km away New homes 8 new homes completed houses · Nov 2025 – Oct 2026
Oct 2026 1.6 km away New homes 12 new homes completed houses · Dec 2025 – Sep 2026
Sept 2026 1.7 km away New homes 21 new homes completed houses · Jul 2025 – Oct 2025
Oct 2025 1.7 km away Planning permission Mar 2024 1.4 km away Planning permission Nov 2023 1.7 km away Planning permission Jan 2023 700 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
4 homes extended 2021–2025, typically adding 55 m²
12 since energy certificates began (2008)
1 in DN37 9SE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
3 hours of spills in 2025 between them (typical neighbourhood: about 36)
3 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 40 planned, approved or being built and 8 running (56 MW between them). Those within 5 km are on the map above.
Rooftop solar Freshney Green Primary Care Centre, Sorrel Road - Solar panels Approved, not yet built · 190 kW
May 2024 1.7 km away Rooftop solar Hilmore Road, Laceby - Photovoltaic Solar System Approved, not yet built · 450 kW
May 2022 1.7 km away Rooftop solar Estate Road - Solar Panels Approved, not yet built · 660 kW
May 2022 1.7 km away Rooftop solar Daniels Chilled Foods, Lakeside - Solar Panels Approved, not yet built · 810 kW
Jul 2025 2.0 km away Rooftop solar Innovation Centre - Solar PV Planning application in
Dec 2021 2.3 km away Rooftop solar Armadillo Self Storage, The Deans, 1 Estate Road - Solar Photovoltaic Approved, not yet built · 150 kW
Jun 2025 2.3 km away Solar farm Grimsby Solar Farm Being built · 50 MW
Jun 2025 2.4 km away Solar farm Bradley Road - Solar Farm Approved, not yet built · 44 MW
Apr 2024 2.4 km away Battery storage Bradley Road - Battery Energy Storage System Approved, not yet built · 10 MW
Apr 2024 2.4 km away Wind farm Estuary Way - Wind Turbine Planning application in
Apr 2024 3.1 km away Rooftop solar
Road and street works within 1 km 1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Pre-application application due July 2027 3.8 km away Decided decided Nov 2021 4.1 km away Decided decided Feb 2025 6.4 km away Decided decided Oct 2024 6.7 km away Decided Viking CCS Pipeline Other Pipe-lines · From land south of VPI Immingham Power Plant to the Theddlethorpe Gas Terminal decided Apr 2025 9.5 km away Decided VPI Immingham OCGT Generating Stations · Site at and adjacent to the existing VPI Immingham Power Station, Rosper Road, Immingham DN40 3DZ decided Aug 2020 10.5 km away Decided
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: HSH Coldstores, Estate Road - Solar Panels (rooftop solar, 1.6 km); Grimsby West, Birchin Way - Solar Array (rooftop solar, 2.7 km); Low Farm Solar Array (solar farm, 3.6 km); Newlincs EfW (energy from waste, 4.3 km); Laceby Solar Farm (solar farm, 4.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.