Country England and Wales › Region Yorkshire and The Humber › Council North East Lincolnshire › Neighbourhood Laceby, Healing & Stallingborough › Postcode DN37 7AW What's changing near DN37 7AW Within 2 km, around Laceby, Healing & Stallingborough in North East Lincolnshire. Building, planning, schools, transport, prices and crime.
13 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.7% like-for-like prices in Laceby, Healing & Stallingborough, 2024 → 2025 (council +0.9%)
+23% recorded crime, last 12 months vs the 12 before
On the map
New homes Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
0 homes extended 2021–2025
0 since energy certificates began (2008)
0 in DN37 7AW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
375 hours of spills in 2025 between them (typical neighbourhood: about 36)
51 spill events counted
Anglian Water Laceby Water Recycling Centre into The Laceby Beck 50 spills, 366 hours in 2025
1.7 km away Anglian Water Laceby-Caistor Road #1 Cso into Laceby Beck 1 spills, 9 hours in 2025
1.7 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 40 planned, approved or being built and 8 running (56 MW between them). Those within 5 km are on the map above.
Solar farm Grimsby Solar Farm Being built · 50 MW
Jun 2025 1.2 km away Rooftop solar Hilmore Road, Laceby - Photovoltaic Solar System Approved, not yet built · 450 kW
May 2022 2.9 km away Solar farm Manor Golf Course, Barton Street - Solar Panels Approved, not yet built
Sept 2024 3.1 km away Solar farm Stallingborough Road - Solar PV Panels Planning application in · 12 MW
Jul 2025 3.4 km away Battery storage Stallingborough Road - Battery Storage Planning application in · 125 MW
Jul 2025 3.4 km away Solar farm Bradley Road - Solar Farm Approved, not yet built · 44 MW
Apr 2024 4.1 km away Battery storage Bradley Road - Battery Energy Storage System Approved, not yet built · 10 MW
Apr 2024 4.1 km away Rooftop solar Harvest Pet Products Limited - Solar Panels Approved, not yet built · 170 kW
Aug 2022 4.3 km away Rooftop solar Freshney Green Primary Care Centre, Sorrel Road - Solar panels Approved, not yet built · 190 kW
May 2024 4.8 km away Rooftop solar Estate Road - Solar Panels Approved, not yet built · 660 kW
May 2022 5.1 km away Rooftop solar
Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Pre-application application due July 2027 6.2 km away Decided decided Nov 2021 6.4 km away Decided decided Oct 2024 7.6 km away Decided decided Feb 2025 7.8 km away Decided Viking CCS Pipeline Other Pipe-lines · From land south of VPI Immingham Power Plant to the Theddlethorpe Gas Terminal decided Apr 2025 9.3 km away Decided decided Feb 2015 9.8 km away Decided
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Laceby Solar Farm (solar farm, 3.8 km); Low Farm Solar Array (solar farm, 3.9 km); HSH Coldstores, Estate Road - Solar Panels (rooftop solar, 4.9 km); Newlincs EfW (energy from waste, 5.8 km); Grimsby West, Birchin Way - Solar Array (rooftop solar, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.