Country England and Wales › Region Yorkshire and The Humber › Council North East Lincolnshire › Neighbourhood Waltham & East Ravendale › Postcode DN37 0DR What's changing near DN37 0DR Within 2 km, around Waltham & East Ravendale in North East Lincolnshire. Building, planning, schools, transport, prices and crime.
122 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-0.6% like-for-like prices in Waltham & East Ravendale, 2024 → 2025 (council +0.9%)
-16% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 37 new homes completed houses · May 2025 – Oct 2026
planned Oct 2026 1.7 km away New homes 25 new homes completed houses · Nov 2025 – Oct 2026
Oct 2026 250 m away New homes 8 new homes completed houses · Nov 2024 – Aug 2026
Aug 2026 1.7 km away New homes 19 new homes completed houses · Dec 2024 – Jul 2026
Jul 2026 400 m away New homes 6 new homes completed houses · Apr 2025 – Apr 2026
Apr 2026 400 m away New homes 5 new homes completed houses · Sep 2025 – Oct 2025
Oct 2025 250 m away New homes 5 new homes completed houses · Feb 2025 – May 2025
May 2025 300 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 16 postcodes nearby had new homes completed in the last two years.
8 homes extended 2021–2025, typically adding 22 m²
10 since energy certificates began (2008)
0 in DN37 0DR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
45 hours of spills in 2025 between them (typical neighbourhood: about 36)
5 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 25 planned, approved or being built and 7 running (71 MW between them). Those within 5 km are on the map above.
Solar farm Manor Golf Course, Barton Street - Solar Panels Approved, not yet built
Sept 2024 3.4 km away Rooftop solar Diana Princess Of Wales Hospital - Solar Panels Approved, not yet built · 810 kW
Feb 2026 3.7 km away Solar farm Bradley Road - Solar Farm Approved, not yet built · 44 MW
Apr 2024 3.7 km away Battery storage Bradley Road - Battery Energy Storage System Approved, not yet built · 10 MW
Apr 2024 3.7 km away Rooftop solar Hilmore Road, Laceby - Photovoltaic Solar System Approved, not yet built · 450 kW
May 2022 4.5 km away Rooftop solar Oasis Academy Wintringham Approved, not yet built · 200 kW
Mar 2020 4.5 km away Rooftop solar Grimsby Institute, Laceby Road - Solar Panels Approved, not yet built · 190 kW
Nov 2022 4.7 km away Solar farm Weelsby Pumping Station, Hewitts Avenue - Solar Panels Approved, not yet built · 380 kW
Apr 2023 4.8 km away Battery storage Hewitts Avenue, New Waltham - Battery Storage Approved, not yet built · 50 MW
Mar 2025 5.1 km away Rooftop solar Freshney Green Primary Care Centre, Sorrel Road - Solar panels Approved, not yet built · 190 kW
May 2024 5.6 km away Road and street works within 1 km 4 permitted works running now or planned, 3 of them major.
Major Sunningdale, Waltham Optional permit (no fee) e.g. for traffic management etc · NORTH EAST LINCOLNSHIRE COUNCIL · No carriageway incursion
Apr 2026 to Nov 2026 300 m away Major, planned Alderley Edge, Waltham New service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Road closure
Jan 2027 to Jan 2027 350 m away Major Alderley Edge, Waltham New service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Road closure
Jan 2027 to Jan 2027 350 m away Minor Chadwell Springs, Waltham Utility repair and maintenance works · ANGLIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 450 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Viking CCS Pipeline Other Pipe-lines · From land south of VPI Immingham Power Plant to the Theddlethorpe Gas Terminal decided Apr 2025 3.4 km away Pre-application application due July 2027 9.7 km away Decided decided Nov 2021 10.1 km away Decided decided Feb 2025 12.5 km away Decided decided Oct 2024 12.7 km away Decided decided Feb 2015 16.0 km away Decided
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Laceby Solar Farm (solar farm, 2.5 km); Low Farm Solar Array (solar farm, 2.6 km); Hewitts Avenue Tesco (rooftop solar, 5.3 km); HSH Coldstores, Estate Road - Solar Panels (rooftop solar, 6.9 km); Grimsby West, Birchin Way - Solar Array (rooftop solar, 6.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.